1. |
18-Apr-2024 09:00 AM |
25-Apr-2024 05:00 PM |
26-Apr-2024 02:00 PM |
[41/EUCC(XI)/LESA(T.G.)/2023-24]
[41/EUCC(XI)/LESA(T.G.)/2023-24 ][2024_MVVNL_922467_1]
|
Madhyanchal Vidyut Vitran Nigam Ltd||C E - LESA||S E (C) - 11
|
2. |
14-Feb-2024 04:00 PM |
25-Apr-2024 05:00 PM |
26-Apr-2024 02:00 PM |
[Construction of Academic building and Hostel Block for Kasturba Gandhi Awasiya Balika Vidyalaya at Kaiserganj Distt Bahraich UP]
[200/Kary-49/41 date 12.02.2024][2024_UPCDS_896752_1]
|
Construction and Design Services UP Jal Nigam||C.G.M. (I) Lucknow||G.M. (03) Lucknow||Unit-10 Allahabad
|
3. |
17-Nov-2023 04:30 PM |
25-Apr-2024 05:00 PM |
26-Apr-2024 03:30 PM |
[FIXING DRAIN PIPE, TRAY AND C.P.V.C PIPE FOR WINDOW AND SPLIT A/C FOR OFFICES AT HYDEL COLONY VARANASI.]
[71/ECD(D)/VNS/2023-24][2023_PVVNV_862741_1]
|
Purvanchal Vidyut Vitran Nigam Limited Varanasi
|
4. |
17-Nov-2023 03:00 PM |
25-Apr-2024 05:00 PM |
26-Apr-2024 03:30 PM |
[DRAINAGE WORK OF EXISTING WINDOW A.C. AT MD OFFICE EXTENSION BUILDING-PUVVNL, VARANASI.]
[72/ECD(D)/VNS/2023-24][2023_PVVNV_862686_1]
|
Purvanchal Vidyut Vitran Nigam Limited Varanasi
|
5. |
12-Apr-2024 06:50 PM |
25-Apr-2024 05:00 PM |
26-Apr-2024 02:00 PM |
[Different types of work against Summer Plan (Business Plan 2024-25) in the area of Alambagh under jurisdiction of E.E., EUDD- Alambagh, LESA, Lucknow]
[105/EUDC-VII/LESA/2023-24][2024_MVVNL_919174_1]
|
Madhyanchal Vidyut Vitran Nigam Ltd||C E - LESA||S E (D) - 7||E E - 1
|
6. |
12-Apr-2024 06:50 PM |
25-Apr-2024 05:00 PM |
26-Apr-2024 02:00 PM |
[Different types of work against Summer Plan (Business Plan 2024-25) in the area of Alambagh under jurisdiction of E.E., EUDD- Alambagh, LESA, Lucknow]
[106/EUDC-VII/LESA/2023-24][2024_MVVNL_919179_1]
|
Madhyanchal Vidyut Vitran Nigam Ltd||C E - LESA||S E (D) - 7||E E - 1
|
7. |
12-Apr-2024 06:50 PM |
25-Apr-2024 05:00 PM |
26-Apr-2024 02:00 PM |
[Different types of work against Summer Plan (Business Plan 2024-25) in the area of Kanpur Road under jurisdiction of E.E., EUDD- Kanpur Road, LESA, Lucknow]
[108/EUDC-VII/LESA/2023-24][2024_MVVNL_919219_1]
|
Madhyanchal Vidyut Vitran Nigam Ltd||C E - LESA||S E (D) - 7||E E - 1
|
8. |
15-Apr-2024 01:00 PM |
25-Apr-2024 05:00 PM |
26-Apr-2024 01:00 PM |
[WORK OF PROVIDING AND FIXING OF HIGH MAST LIGHT FITTING WITH ITS ACCESSORIES AT 220 KV S/S KATRARI, DEORIA UNDER ETD, DEORIA ]
[E-Tender No. 87-ETC(G)/2023-24][2024_UPTCL_922245_1]
|
UP Power Transmission Corp.Ltd (Operation)||Chief Engineer (TNE) North-East Gorakhpur||SE, ETC, Gorakhpur
|
9. |
18-Apr-2024 05:00 PM |
25-Apr-2024 05:00 PM |
26-Apr-2024 02:00 PM |
[Construction of Double Circuit 33 KV U/G line from 220 KV Satrik to 33/11 KV S/S Mantri Awas and assoicated work On Semi turnkey basis Under Business Plan 2024-25.]
[42/EUCC(XI)/LESA][2024_MVVNL_922492_1]
|
Madhyanchal Vidyut Vitran Nigam Ltd||C E - LESA||S E (C) - 11
|
10. |
19-Apr-2024 04:00 PM |
25-Apr-2024 05:00 PM |
26-Apr-2024 02:00 PM |
[Construction of Single Circuit 33 KV U/G from 132 KV Indira Nagar to 33/11 KV S/S Sector-25, Kalyanpur and Sarvoday Nagar, Indira Nagar and assoicated work On Semi turnkey basis Under Business Plan 2024-25.]
[44/EUCC(XI)/LESA(T.G.)/2023-24][2024_MVVNL_922574_1]
|
Madhyanchal Vidyut Vitran Nigam Ltd||C E - LESA||S E (C) - 11
|