1. |
30-Jan-2024 09:00 AM |
28-Mar-2024 04:00 PM |
30-Mar-2024 05:00 PM |
[Supply of Tube nest assembly of Turbine oil cooler of 3X210]
[T-65/CF-173/PD-I/ABTPS/ ANP/2023-24][2024_RVUNL_887188_1]
|
UP Rajya Vidyut Utpadan Nigam Ltd||Anpara Thermal Power Project- UPRVUNL- Sonebhadra
|
2. |
22-Feb-2024 06:30 PM |
28-Mar-2024 04:00 PM |
30-Mar-2024 04:00 PM |
[Supply Of Vulcanized endless rubber belt for raw coal feeder, 2x500MW, BTPS and DTPS, Anpara]
[T-75/CF-259/PD-I/ABTPS/ ANP/2023-24][2024_RVUNL_903039_1]
|
UP Rajya Vidyut Utpadan Nigam Ltd||Anpara Thermal Power Project- UPRVUNL- Sonebhadra
|
3. |
28-Feb-2024 06:00 PM |
28-Mar-2024 04:00 PM |
29-Mar-2024 02:00 PM |
[DIESEL VEHICLE FOR EE, EUDD-IV GKP]
[48EUDC(G)/2023-24][2024_PVVNV_907349_1]
|
Purvanchal Vidyut Vitran Nigam Limited Varanasi||Chief Engineer (D) PuVVNL Gorakhpur
|
4. |
06-Mar-2024 09:00 AM |
28-Mar-2024 04:00 PM |
30-Mar-2024 02:00 PM |
[WORK]
[E-TENDER No. 65 ETC-II(VNS)2023-24][2024_UPTCL_911338_1]
|
UP Power Transmission Corp.Ltd (Operation)||Chief Engineer (TE) East Allahabad||S.E. ETC Ghazipur
|
5. |
05-Mar-2024 09:00 AM |
28-Mar-2024 04:00 PM |
30-Mar-2024 02:00 PM |
[WORK]
[E-TENDER No. 64 ETC-II(VNS)2023-24][2024_UPTCL_910957_1]
|
UP Power Transmission Corp.Ltd (Operation)||Chief Engineer (TE) East Allahabad||S.E. ETC Ghazipur
|
6. |
08-Mar-2024 04:00 PM |
28-Mar-2024 04:00 PM |
30-Mar-2024 04:00 PM |
[T- 63/PD-II/DTPS/CF-224/2023-24]
[T-63/PD-II/DTPS/CF-224/2023-24][2024_RVUNL_914372_1]
|
UP Rajya Vidyut Utpadan Nigam Ltd||Anpara Thermal Power Project- UPRVUNL- Sonebhadra
|
7. |
14-Mar-2024 02:00 PM |
28-Mar-2024 04:00 PM |
30-Mar-2024 04:00 PM |
[ Supply of Transformer Oil]
[N-PAR/B/MMC1/PD01/6000003881][2024_RVUNL_887677_2]
|
UP Rajya Vidyut Utpadan Nigam Ltd||Parichha Thermal Power Project- UPRVUNL- Jhansi
|
8. |
14-Mar-2024 03:30 PM |
28-Mar-2024 04:00 PM |
28-Mar-2024 04:30 PM |
[Jais Nagar Palika Parishad Water Supply Reorganization Scheme]
[571/W-60/06][2024_UPJNM_917050_1]
|
U P Jal Nigam (HQ), Lucknow||Chief Engineer (Faizabad)||SE, CC, Faizabad||EE Construction Division Faizabad
|
9. |
15-Mar-2024 11:00 AM |
28-Mar-2024 04:00 PM |
28-Mar-2024 05:30 PM |
[Laying of water line newer labur satte in sikrol ward]
[1364/EE(N)/JKNN/23-24 Dated- 12-10-2023][2023_NNVAR_851232_40]
|
Varanasi Nagar Nigam Varanasi
|
10. |
15-Mar-2024 03:00 PM |
28-Mar-2024 04:00 PM |
30-Mar-2024 12:30 PM |
[Work]
[T.No. 65/ETCS/2023-24][2024_UPTCL_917606_1]
|
UP Power Transmission Corp.Ltd (Operation)||Chief Engineer (TC) Lucknow||SE ETC Sultanpur||Accountant 400kv Substation Division Sultanpur
|