1. |
18-Mar-2024 02:00 PM |
19-Apr-2024 04:00 PM |
20-Apr-2024 12:00 PM |
[Line regrouping and increasing capacity of TF and replacement of 11 VCB 2 No outgoing work under Add BP in the area of EDD-IV Jnp]
[105/EDC-I(Jnp)/2023-24][2024_PVVNV_919104_1]
|
Purvanchal Vidyut Vitran Nigam Limited Varanasi
|
2. |
18-Mar-2024 02:00 PM |
19-Apr-2024 04:00 PM |
20-Apr-2024 12:00 PM |
[work for construction of new 11 KV feeder bifuraction, 11KV cable 3x300 sq mm ud Additional BP in EDD-IV Jnp]
[104/EDC-I(Jnp)/2023-24][2024_PVVNV_919099_1]
|
Purvanchal Vidyut Vitran Nigam Limited Varanasi
|
3. |
18-Mar-2024 04:30 PM |
19-Apr-2024 04:00 PM |
20-Apr-2024 12:00 PM |
[work forfabrication and errecttion of tailess unit BP sch in the area of EDD-I Jnp]
[107/EDC-I(Jnp)/2023-24][2024_PVVNV_919135_1]
|
Purvanchal Vidyut Vitran Nigam Limited Varanasi
|
4. |
18-Mar-2024 12:00 PM |
19-Apr-2024 04:00 PM |
20-Apr-2024 12:00 PM |
[work for installation of Delta earthing of power TF and 11Kv swithchgear and fabrication and errection of taillless unit for under EDD-IV Jnp]
[98/EDC-I(Jnp)/2023-24][2024_PVVNV_919082_1]
|
Purvanchal Vidyut Vitran Nigam Limited Varanasi
|
5. |
16-Mar-2024 05:10 PM |
19-Apr-2024 04:00 PM |
20-Apr-2024 12:00 PM |
[work for line regrouping under BP scheme in the area of EDD-IV Jnp]
[94/EDC-I(Jnp)/2023-24][2024_PVVNV_918924_1]
|
Purvanchal Vidyut Vitran Nigam Limited Varanasi
|
6. |
15-Mar-2024 12:00 PM |
19-Apr-2024 04:00 PM |
20-Apr-2024 12:00 PM |
[work for installation of 33 kv control pannel , VCB,PT, CT Isollater LA etc ud EDD-I Jnp]
[85/EDC-I(Jnp)/2023-24][2024_PVVNV_917354_1]
|
Purvanchal Vidyut Vitran Nigam Limited Varanasi
|
7. |
09-Apr-2024 09:00 AM |
19-Apr-2024 04:00 PM |
20-Apr-2024 02:00 PM |
[WORK]
[Short Term E-tender No. 02 ETC-II(VNS)2024-25][2024_UPTCL_921477_1]
|
UP Power Transmission Corp.Ltd (Operation)||Chief Engineer (TE) East Allahabad||S.E. ETC Ghazipur
|
8. |
11-Mar-2024 09:00 AM |
19-Apr-2024 04:00 PM |
19-Apr-2024 04:30 PM |
[Nagar Nigam Ayodhya Sewerage Scheme District 1 Part-II and District-1 Part-I Zone-1 and 2]
[446/W-77/03][2024_UPJNM_915053_1]
|
U P Jal Nigam (HQ), Lucknow||Chief Engineer (Faizabad)||SE, CC, Faizabad||PM Urban Works Unit Faizabad
|
9. |
20-Feb-2024 11:00 AM |
19-Apr-2024 04:00 PM |
19-Apr-2024 05:00 PM |
[Construction of Main Building, Cafeteria and Guest House at Government Polytechnic, Mirzapur, Distt- Mirzapur ]
[283/W-1/11 Dated 19.02.2024][2024_UPCDS_900858_1]
|
Construction and Design Services UP Jal Nigam||C.G.M. (IV) Lucknow||G.M. (14) Lucknow||Unit - 38 Sonebhadra
|
10. |
18-Mar-2024 12:00 PM |
19-Apr-2024 04:00 PM |
20-Apr-2024 12:00 PM |
[work for replacement of Damaged Pole]
[96/EDC-I(Jnp)/2023-24][2024_PVVNV_919076_1]
|
Purvanchal Vidyut Vitran Nigam Limited Varanasi
|