Logo
Notices
« Bidder Manual for Online Payment of Tender related Fees in eProcurement Portal.
 
 
 
  Tenders/Auctions Closing Today
 
 
 Search By     
 
 
 
 
S.No e-Published Date Bid Submission Closing Date Tender Opening Date Title and Ref.No./Tender ID Organisation Chain
1. 14-Jan-2022 04:00 PM 24-Jan-2022 05:00 PM 25-Jan-2022 02:30 PM [CIVIL MAINTENANCE WORK AT MADHYANCHAL HEADQUARTER CAMPUS,4-A,GOKHLE MARG, LUCKNOW] [27/ECD (D)/L/Tender/ 2021-22][2022_MVVNL_674486_1] Madhyanchal Vidyut Vitran Nigam Ltd||C E - Civil||S E (Civil) Distribution - 2||E E Electricity Civil Div.(Dist.) Lucknow
2. 17-Nov-2021 09:00 AM 24-Jan-2022 05:00 PM 25-Jan-2022 11:00 AM [41/EDCB/2021-22] [41/EDCB/2021-22][2021_MVVNL_643823_1] Madhyanchal Vidyut Vitran Nigam Ltd||C E - BAREILLY ZONE||S E - Bareilly (Rural)
3. 19-Nov-2021 09:00 AM 24-Jan-2022 05:00 PM 25-Jan-2022 02:00 PM [Supply of new 01 Nos. 25 H.P submersible type drainage pump and new 01 Nos. 75 H.P submersible type dewatering pump of scope of supply and the site requirement along with other accessories of discharge pipe line in dewatering system at HOPS,Obra.] [T-11/HOPS/2021-22][2021_UPJVN_644642_1] Uttar Pradesh Jal Vidyut Nigam Limited||Chief Engineer OM Lucknow||SE(pipri)||EE (EGD) Obra
4. 19-Nov-2021 09:00 AM 24-Jan-2022 05:00 PM 25-Jan-2022 02:00 PM [Design, manufacturing, Supply, Installation, Testing and Commissioning of new centralized Air Conditioning system capacity 2X25 TR (water cooled) along with Power supply and control panel with dismantling of existing AC system in 3x33 MW HOPS Obra.] [T-12/HOPS/2021-22][2021_UPJVN_644888_1] Uttar Pradesh Jal Vidyut Nigam Limited||Chief Engineer OM Lucknow||SE(pipri)||EE (EGD) Obra
5. 15-Dec-2021 04:00 PM 24-Jan-2022 05:00 PM 25-Jan-2022 03:30 PM [TD-472/21] [TD-472/21][2021_PTRCL_657219_1] U.P. Power Transmission Corporation Ltd.||Transmission HQ||SE Electy Transmission Design Circle
6. 16-Dec-2021 05:00 PM 24-Jan-2022 05:00 PM 25-Jan-2022 01:00 PM [ATTENDING OF OIL LEAKAGE AND CENTRIFUGING OF T/F OIL OF 160 MVA T/F-I AT 220 KV S/S AZAMGARH-II UNDER ETD, AZAMGARH.] [ 46/AETC/2021-22 ][2021_UPTCL_658002_1] UP Power Transmission Corp.Ltd (Operation)||Chief Engineer (TNE) North-East Gorakhpur||SE, ETC, Azamgarh
7. 28-Dec-2021 09:00 AM 24-Jan-2022 05:00 PM 25-Jan-2022 03:30 PM [construction of nagar panchayat office building sujabad varanasi] [985/M-8/21 dated 24.12.2021][2021_UPCDS_664170_1] Construction and Design Services UP Jal Nigam||C.G.M. (IV) Lucknow||G.M. (10) Lucknow||Unit-03 Azamgarh
8. 03-Jan-2022 01:00 PM 24-Jan-2022 05:00 PM 25-Jan-2022 11:00 AM [SUPPLY, INSTALLATION, TESTING AND COMMISIONING OF 1 NOS ELEVATOR FOR 13 PASSENGER 884 KG AND 1 NOS ELEVATOR FOR 16 PASSENGER 1088 KG GOODS FOR 100 PERSON BARRACK G5 AT POLICE LINE SIDDHARTH NAGAR UP] [5223/pan/et/21-22, Dt. 31-12-2021][2022_UPPAN_670050_1] UP Police Awas Nigam Limited||UP Police Awas Nigam Ltd HQ Lucknow||Construction Unit Lucknow
9. 03-Jan-2022 01:00 PM 24-Jan-2022 05:00 PM 25-Jan-2022 11:00 AM [SUPPLY INSTALLATION TESTING AND COMMISIONING OF 1 NOS ELEVATOR FOR 13 PASSENGER 884 KG AND 1 NOS ELEVATOR FOR 16 PASSENGER 1088 KG GOODS FOR 100 PERSON BARRACK G5 AT POLICE LINE BARABANKI UP] [5234/pan/et/21-22, Dt. 31-12-2021][2022_UPPAN_670056_1] UP Police Awas Nigam Limited||UP Police Awas Nigam Ltd HQ Lucknow||Construction Unit Lucknow
10. 03-Jan-2022 01:00 PM 24-Jan-2022 05:00 PM 25-Jan-2022 11:00 AM [SUPPLY, INSTALLATION, TESTING AND COMMISIONING OF 1 NOS ELEVATOR FOR 13 PASSENGER 884 KG AND 1 NOS ELEVATOR FOR 16 PASSENGER 1088 KG GOODS FOR 100 PERSON BARRACK G5 AT POLICE LINE UNNAO UP] [5227/pan/et/21-22, Dt. 31-12-2021][2022_UPPAN_670053_1] UP Police Awas Nigam Limited||UP Police Awas Nigam Ltd HQ Lucknow||Construction Unit Lucknow
Visitor No:9712268
Contents owned and maintained by concerned Departments in coordination with Finance Department and Information Technology Department, Government of Uttar Pradesh