1. |
19-Mar-2024 06:00 PM |
19-Apr-2024 01:00 PM |
20-Apr-2024 04:00 PM |
[Operation, Maintenance, Overhauling and replacement work in Fuel Oil pump house of PTPP, Parichha]
[N-PARC/OMC5/CHD2/6000005016_00][2024_RVUNL_919249_1]
|
UP Rajya Vidyut Utpadan Nigam Ltd||Parichha Thermal Power Project- UPRVUNL- Jhansi
|
2. |
20-Mar-2024 05:00 PM |
19-Apr-2024 01:00 PM |
20-Apr-2024 03:30 PM |
[Work]
[ET-41/ETC(M)/23-24][2024_UPTCL_919514_1]
|
UP Power Transmission Corp.Ltd (Operation)||Chief Engineer (TS) South Agra||SE, ETC, Mathura
|
3. |
20-Mar-2024 05:00 PM |
19-Apr-2024 01:00 PM |
20-Apr-2024 03:00 PM |
[Work]
[ET-40/ETC(M)/23-24][2024_UPTCL_919506_1]
|
UP Power Transmission Corp.Ltd (Operation)||Chief Engineer (TS) South Agra||SE, ETC, Mathura
|
4. |
12-Apr-2024 06:00 PM |
19-Apr-2024 01:00 PM |
19-Apr-2024 04:00 PM |
[Const. of 33KV Line for Feeding SS Sec- 62 Khoda from 220KV SS Ghazipur]
[98/ECWD/Gzb/2023-24][2024_PVVNL_922139_1]
|
Paschimanchal Vidyut Vitran Nigam Ltd.
|
5. |
13-Apr-2024 06:40 PM |
19-Apr-2024 01:00 PM |
19-Apr-2024 04:00 PM |
[Inc SEctor- 88, Sector- 80 Old and Sector- 124]
[106/ECWD/Gzb/2023-24][2024_PVVNL_922216_1]
|
Paschimanchal Vidyut Vitran Nigam Ltd.
|
6. |
02-Mar-2024 02:00 PM |
19-Apr-2024 01:00 PM |
20-Apr-2024 04:00 PM |
[T-01/SEEMCCV/CPD/CTPS/2023-24]
[T-01/SEEMCCV/CPD/CTPS/2023-24][2024_RVUNL_909336_1]
|
UP Rajya Vidyut Utpadan Nigam Ltd||Obra Thermal Power Project- UPRVUNL- Sonebhadra
|
7. |
12-Apr-2024 06:00 PM |
19-Apr-2024 01:00 PM |
19-Apr-2024 04:00 PM |
[Const. of 33KV Line Sudamapuri, Udyogkunj to Bamheta Kisan Hub Mehrolli]
[90/ECWD/Gzb/2023-24][2024_PVVNL_922136_1]
|
Paschimanchal Vidyut Vitran Nigam Ltd.
|
8. |
02-Mar-2024 02:00 PM |
19-Apr-2024 01:00 PM |
20-Apr-2024 04:00 PM |
[T-02/SEEMCCV/CPD/CTPS/2023-24]
[T-02/SEEMCCV/CPD/CTPS/2023-24][2024_RVUNL_909380_1]
|
UP Rajya Vidyut Utpadan Nigam Ltd||Obra Thermal Power Project- UPRVUNL- Sonebhadra
|
9. |
05-Mar-2024 04:00 PM |
19-Apr-2024 01:00 PM |
19-Apr-2024 05:00 PM |
[Work of Annual Maintenance of Computer Refilling,Printer, Scanner and electrician.]
[130EDC(V)/2023-24][2024_PVVNV_911541_1]
|
Purvanchal Vidyut Vitran Nigam Limited Varanasi||Chief Engineer (D) PuVVNL Varanasi
|
10. |
12-Apr-2024 06:00 PM |
19-Apr-2024 01:00 PM |
19-Apr-2024 04:00 PM |
[Inc. Cap. Rameshwar Park, Pavi, Roop Nagar-2 Ghaziabad]
[97/ECWD/Gzb/2023-24][2024_PVVNL_922073_1]
|
Paschimanchal Vidyut Vitran Nigam Ltd.
|