1. |
10-Apr-2024 04:00 PM |
19-Apr-2024 10:00 AM |
20-Apr-2024 10:30 AM |
[Work]
[T-04/ETDB/2024-25][2024_UPTCL_921994_1]
|
UP Power Transmission Corp.Ltd (Operation)||Chief Engineer (TS) South Agra||SE ETC Banda||EE ETD Banda
|
2. |
10-Apr-2024 04:00 PM |
19-Apr-2024 10:00 AM |
20-Apr-2024 11:00 AM |
[Work]
[T-05/ETDB/2024-25][2024_UPTCL_921996_1]
|
UP Power Transmission Corp.Ltd (Operation)||Chief Engineer (TS) South Agra||SE ETC Banda||EE ETD Banda
|
3. |
28-Mar-2024 04:30 PM |
19-Apr-2024 11:00 AM |
19-Apr-2024 03:00 PM |
[Work]
[ET-06/ETD-I (K)/2023-24][2024_UPTCL_920616_1]
|
UP Power Transmission Corp.Ltd (Operation)||Chief Engineer (TS) South Agra||S.E. ETC-I Kanpur||EE ETD - I Kanpur
|
4. |
13-Mar-2024 05:00 PM |
19-Apr-2024 11:00 AM |
19-Apr-2024 03:00 PM |
[PROVIDING 01 NO 5.0 KVA GENERATOR SET WITH OPERATOR UNDER EXECUTIVE ENGINEER ETD III BULANDSHAHR.]
[101/EDC-III/B/2023-2024][2024_PVVNL_916446_1]
|
Paschimanchal Vidyut Vitran Nigam Ltd.
|
5. |
08-Apr-2024 10:00 AM |
19-Apr-2024 11:00 AM |
19-Apr-2024 11:00 AM |
[Ramala Chini Mill Operation and Maintenance Through out Sourcing]
[49/e-tender/Mill Op./2024-25 Dated 06.04.2024][2024_RSCML_921719_1]
|
Ramala Sahkari Chini Mills Ltd. Ramala (Baghpat)
|
6. |
03-Apr-2024 06:00 PM |
19-Apr-2024 11:00 AM |
20-Apr-2024 03:00 PM |
[e]
[T-01/ETD/MUN/2024-25][2024_UPTCL_921238_1]
|
UP Power Transmission Corp.Ltd (Operation)||Chief Engineer (TW) West Meerut||SE ETC Ghaziabad||EE ETD MURADNAGAR
|
7. |
26-Feb-2024 02:00 PM |
19-Apr-2024 12:00 PM |
19-Apr-2024 03:00 PM |
[ONE NO. DIESEL VEHICAL WITH DRIVER FOR S.D.O., E.D.S.D.-BARHALGANJ]
[72/EDC-II(G)/2023-24 ][2024_PVVNV_905690_1]
|
Purvanchal Vidyut Vitran Nigam Limited Varanasi||Chief Engineer (D) PuVVNL Gorakhpur
|
8. |
15-Mar-2024 03:00 PM |
19-Apr-2024 12:00 PM |
19-Apr-2024 03:00 PM |
[Construction of 132 KV Chhata Kosi Circuit-III Line Bay At 132 KV Sub-Station Kosikalan,Mathura]
[Tender No-41][2024_UPCTL_917584_1]
|
UP Power Transmission Corp.Ltd (Works and Projects))||Chief Engineer (Civil-1)||Agra Circle
|
9. |
13-Apr-2024 09:00 AM |
19-Apr-2024 12:00 PM |
19-Apr-2024 04:00 PM |
[SINGLE STAGE 2024-25 HANDLING AND TRANSPORT WORK AT BLOCK-KHALILABAD-SANT KABIR NAGAR]
[146/SINGLE STAGE/12-04-2024][2024_DOFCS_922153_5]
|
Department of Food and Civil Supplies||Office of Regional Food Controller Basti
|
10. |
15-Mar-2024 06:00 PM |
19-Apr-2024 12:00 PM |
20-Apr-2024 03:00 PM |
[CONSTRUCTION OF NEW 33KV SUJABAD BAY AT 220KV SUBSTATION SAHUPURI]
[E-Tender no. 66/2023-24/ETC-I/VNS][2024_UPTCL_917730_1]
|
UP Power Transmission Corp.Ltd (Operation)||Chief Engineer (TE) East Allahabad||S.E. ETC Varanasi
|