Logo
Notices eProcurement System Government of Uttar Pradesh
The eProcurement System of Uttar Pradesh enables the Tenderers to download the Tender Schedule free of cost and then submit the bids online through this portal.
 
app-dashboard playstore playstore
Latest Tenders  
Tender Title Reference No Closing Date Bid Opening Date
1. t no 23 t no 23 23-May-2022 04:00 PM 23-May-2022 04:30 PM
2. Construction Work of Main Building of Rajkiya Girls Inter College at Afzalgarh, Distt- Bijnor (UP) 15/PCL/GM/Zone-6/Noida/2022-23 Dated 17.05.2022 27-May-2022 02:00 PM 27-May-2022 03:00 PM
3. T no 22 T no 22 23-May-2022 03:30 PM 23-May-2022 04:00 PM
4. Supply and fixing of 1.1 KW solar panel with 5 DC celling fan, 1 DC summersible pump, 1 RO water palnt 100 Liter storage tank with 2nos PVC over head tank 1000 liter capacity in candauli.(07 nos) 90/EE-VNS/E-TENDER/2022-23 23-May-2022 05:00 PM 24-May-2022 12:00 PM
5. moh pathanpura me cc road or nali construction work Moh Pathanpura me CC Road Nali Contruction work 24-May-2022 12:00 PM 24-May-2022 04:00 PM
6. Oiling and Greasing and maintaining Barrel of Km 1.700 Barikala barrel for Flood prepration work on R.G.B. of U/S Harding Bridge (Lot-07) 01/A.E.-I/2022-23 24-May-2022 12:00 PM 24-May-2022 03:00 PM
7. CHC Sahatwar Material and Labour 131/EE-BALLIA/E-TENDER/2022-23 24-May-2022 05:00 PM 25-May-2022 12:00 PM
8. Oiling and Greasing and maintaining Barrel of Km 0.100 new bund for Flood prepration work on R.G.B. of U/S Harding Bridge (Lot-06) 01/A.E.-I/2022-23 24-May-2022 12:00 PM 24-May-2022 03:00 PM
9. MOH SIKSHAK NAGAR 200 MM OR 160 MM PIPE LINE WORK MOH SIKSHAK NAGAR 200 MM OR 160 MM PIPE LINE WORK 24-May-2022 12:00 PM 24-May-2022 04:00 PM
10. Oiling and Greasing and maintaining Barrel of mallahi tola nala for Flood prepration work on R.G.B. of U/S Harding Bridge (Lot-05) 01/A.E.-I/2022-23 24-May-2022 12:00 PM 24-May-2022 03:00 PM
Latest Tenders updates every 15 mins.    More...
 
Latest Corrigendums
Corrigendum Title Reference No Closing Date Bid Opening Date
1. Corrigendum 1 UPD/TRANSFORMER/2022/A 21-May-2022 03:00 PM 23-May-2022 04:00 PM
2. Corrigendum2 T-01/SE-V/BTPS/CHD-I/2022-23 02-Jun-2022 05:00 PM 04-Jun-2022 04:00 PM
3. 21changetime 08 08/2022-23/EDC-BAGHPAT 21-May-2022 12:00 PM 21-May-2022 04:00 PM
4. Corrigendum2 T-02/SE-V/BTPS/CHD-I/2022-23 02-Jun-2022 05:00 PM 04-Jun-2022 04:00 PM
5. Corrigendum T-04/SE-V/BTPS/CHD-I/2022-23 02-Jun-2022 05:00 PM 04-Jun-2022 04:00 PM
6. 21changetime 09 09/2022-23/EDC-BAGHPAT 21-May-2022 12:00 PM 21-May-2022 04:00 PM
7. 21changetime 120 120/2021-22 EDC Baghpat 21-May-2022 12:00 PM 21-May-2022 04:00 PM
8. CLARIFICATIONS 187/ExEn/EnvEng/NNM/2021-22 Date 11-03-2022 23-May-2022 05:00 PM 23-May-2022 05:00 PM
9. DATE AND TIME UPDATION 187/ExEn/EnvEng/NNM/2021-22 Date 11-03-2022 23-May-2022 05:00 PM 23-May-2022 05:00 PM
10. Date extended T-19/EDC-I/B/2022-23 26-May-2022 01:00 PM 26-May-2022 04:00 PM
  Latest Corrigendum updates every 15 mins.    More...
 
Certifying Agency
STQC Logo
Visitor No:9712268
Contents owned and maintained by concerned Departments in coordination with Finance Department and Information Technology Department, Government of Uttar Pradesh