Logo
Notices eProcurement System Government of Uttar Pradesh
 
 
 
  Tenders/Auctions Closing Today
 
 
 Search By     
 
 
 
 
S.No e-Published Date Bid Submission Closing Date Tender Opening Date Title and Ref.No./Tender ID Organisation Chain
1. 28-Feb-2024 03:15 PM 25-Apr-2024 04:00 PM 26-Apr-2024 02:00 PM [Tourism development work of Kali Devi Mandir Ramlila Bagh Block-Nagina, District Bijnor (U.P.)] [715/M-18/214 dated 27-02-2024][2024_UPCDS_907157_1] Construction and Design Services UP Jal Nigam||C.G.M. (III) Lucknow||G.M. (01) Lucknow||Unit-18 Moradabad
2. 15-Mar-2024 01:00 PM 25-Apr-2024 04:00 PM 26-Apr-2024 03:00 PM [DEVELOPMENT OF INFRASTRUCTURE FOR ELECTRIFICATION OF UN-ELECTRIFIED HOUSEHOLDS] [EAV-203/2023-24][2024_PVVNV_917544_1] Purvanchal Vidyut Vitran Nigam Limited Varanasi
3. 19-Mar-2024 06:55 PM 25-Apr-2024 04:00 PM 26-Apr-2024 02:00 PM [33/11KV, 10 MVA Power Transformer] [MEDCO/2905/2024][2024_MVVNL_919363_1] Madhyanchal Vidyut Vitran Nigam Ltd||C E (MM)
4. 20-Mar-2024 10:00 AM 25-Apr-2024 04:00 PM 26-Apr-2024 02:00 PM [Supply of 11/0.433 KV, 250 KVA, 1 Star Previously Level-2 Now Level-1 as per (IS 1180 Part-I) 2014 (Amendment-4) Copper Wound Distribution Transformer BIS Certified with Protection Features] [MEDCO/2903/2024][2024_MVVNL_919383_1] Madhyanchal Vidyut Vitran Nigam Ltd||C E (MM)
5. 15-Mar-2024 12:00 PM 25-Apr-2024 04:00 PM 26-Apr-2024 01:00 PM [work for installation of 33 kv control pannel , VCB,PT, CT Isollater LA etc ud EDD-I Jnp] [85/EDC-I(Jnp)/2023-24][2024_PVVNV_917354_1] Purvanchal Vidyut Vitran Nigam Limited Varanasi
6. 15-Mar-2024 06:00 PM 25-Apr-2024 04:00 PM 26-Apr-2024 03:00 PM [Development of Infrastructure for Electrification of Un-electrified Households] [EAV-207/2023-24][2024_PVVNV_917871_1] Purvanchal Vidyut Vitran Nigam Limited Varanasi
7. 18-Apr-2024 06:00 PM 25-Apr-2024 04:00 PM 26-Apr-2024 02:00 PM [Providing 01 no. diesel Vehicle with driver for the Anti Power Theft, Santkabirnagar for the Period 01.04.2024 to 31.03.2025] [108/EDC(SKN)/2023-24][2024_PVVNV_903497_2] Purvanchal Vidyut Vitran Nigam Limited Varanasi||Chief Engineer (D) PuVVNL Basti
8. 19-Apr-2024 04:00 PM 25-Apr-2024 04:00 PM 26-Apr-2024 02:00 PM [Providing 01 no. diesel Vehicle with driver for the Executive Engineer, Electricity Test Division, Santkabirnagar for the Period 01.04.2024 to 31.03.2025] [106/EDC(SKN)/2023-24][2024_PVVNV_903455_2] Purvanchal Vidyut Vitran Nigam Limited Varanasi||Chief Engineer (D) PuVVNL Basti
9. 15-Mar-2024 06:00 PM 25-Apr-2024 04:00 PM 26-Apr-2024 03:00 PM [Development of Infrastructure for Electrification of Un-electrified Households] [EAV-206/2023-24][2024_PVVNV_917801_1] Purvanchal Vidyut Vitran Nigam Limited Varanasi
10. 19-Apr-2024 10:00 AM 25-Apr-2024 04:00 PM 25-Apr-2024 04:10 PM [Stationary Supply to District Cooperative Bank Etah for 1 year] [70_Store_2024-25][2024_UPCBL_922553_1] UP Cooperative Bank Ltd.||Etah District Co-Operative Bank Ltd.
Visitor No:9712268
Contents owned and maintained by concerned Departments in coordination with Finance Department and Information Technology Department, Government of Uttar Pradesh