S.No e-Published Date Closing Date Opening Date Title and Ref.No./Tender ID Organisation Chain
1 10-May-2024 06:00 PM 17-May-2024 06:00 PM 18-May-2024 03:00 PM [01/EDCK/2024-25] [01/EDCK/2024-25][2024_DVVNL_922355_2] Dakshinanchal Vidyut Vitran Nigam Ltd.
2 10-May-2024 04:00 PM 16-May-2024 12:00 PM 16-May-2024 02:00 PM [EDCH-192/2023-24] [EDCH-192/2023-24][2024_DVVNL_922793_2] Dakshinanchal Vidyut Vitran Nigam Ltd.
3 10-May-2024 04:00 PM 16-May-2024 12:00 PM 16-May-2024 02:00 PM [EDCH-191/2023-24] [EDCH-191/2023-24][2024_DVVNL_922797_2] Dakshinanchal Vidyut Vitran Nigam Ltd.
4 10-May-2024 04:00 PM 16-May-2024 12:00 PM 16-May-2024 02:00 PM [EDCH-193/2023-24] [EDCH-193/2023-24][2024_DVVNL_922796_3] Dakshinanchal Vidyut Vitran Nigam Ltd.
5 10-May-2024 03:30 PM 16-May-2024 12:00 PM 16-May-2024 02:00 PM [EDCH-190/2023-24] [EDCH-190/2023-24][2024_DVVNL_922792_2] Dakshinanchal Vidyut Vitran Nigam Ltd.
6 10-May-2024 03:00 PM 16-May-2024 01:00 PM 17-May-2024 04:00 PM [DVVNL-MM/3551-2024 -33 KV CT 400/200/1-1-1 A] [DVVNL-MM/3551-2024][2024_DVVNL_924561_1] Dakshinanchal Vidyut Vitran Nigam Ltd.
7 10-May-2024 03:00 PM 16-May-2024 12:00 PM 16-May-2024 02:00 PM [EDCH-189/2023-24] [EDCH-189/2023-24][2024_DVVNL_923352_2] Dakshinanchal Vidyut Vitran Nigam Ltd.
8 10-May-2024 03:00 PM 16-May-2024 12:00 PM 16-May-2024 02:00 PM [EDCH-188/2023-24] [EDCH-188/2023-24][2024_DVVNL_922784_2] Dakshinanchal Vidyut Vitran Nigam Ltd.
9 10-May-2024 03:00 PM 16-May-2024 02:00 PM 16-May-2024 05:00 PM [Construction of new 33 kv line (25 km) from 220 kv sub-station Tindwari road banda to 33/11 kv sub station tindwari, Banda (Semi Turn-Key)] [SE/ESWC/BANDA/16/2023-24][2024_DVVNL_921107_2] Dakshinanchal Vidyut Vitran Nigam Ltd.
10 09-May-2024 05:00 PM 17-May-2024 06:00 PM 18-May-2024 03:00 PM [254/EDCK/2023-24] [254/EDCK/2023-24][2024_DVVNL_924456_1] Dakshinanchal Vidyut Vitran Nigam Ltd.
11 09-May-2024 05:00 PM 14-May-2024 05:20 PM 14-May-2024 05:20 PM [Work] [ED CH-05/2024-25][2024_DVVNL_924497_1] Dakshinanchal Vidyut Vitran Nigam Ltd.
12 09-May-2024 04:10 PM 14-May-2024 04:30 PM 14-May-2024 05:10 PM [EDCH-167/2023-24] [EDCH-167/2023-24][2024_DVVNL_901703_3] Dakshinanchal Vidyut Vitran Nigam Ltd.
13 09-May-2024 01:30 PM 14-May-2024 02:00 PM 14-May-2024 03:00 PM [33 KV Substations/line erection/strengthening works under business plan 2024-25 in the area of EDC II, Mathura on semi turnkey basis] [99/EDC-II(M)/2023-24][2024_DVVNL_922131_3] Dakshinanchal Vidyut Vitran Nigam Ltd.
14 09-May-2024 12:00 PM 14-May-2024 12:00 PM 14-May-2024 02:00 PM [EDCK-91/2023-24] [EDCK-91/2023-24][2024_DVVNL_922779_3] Dakshinanchal Vidyut Vitran Nigam Ltd.
15 09-May-2024 11:30 AM 14-May-2024 12:00 PM 14-May-2024 03:00 PM [Increasing capacity of D. Transformers/ additional DT installation works under business plan 2024-25 in the area of EDC II, Mathura on semi turnkey basis] [101/EDC-II(M)/2023-24][2024_DVVNL_922137_3] Dakshinanchal Vidyut Vitran Nigam Ltd.
16 09-May-2024 11:30 AM 14-May-2024 12:00 PM 14-May-2024 03:00 PM [11 KV VCB/line Erection/strengthening works under business plan 2024-25 in the area of EDC II, Mathura on semi turnkey basis.] [100/EDC-II(M)/2023-24][2024_DVVNL_922135_3] Dakshinanchal Vidyut Vitran Nigam Ltd.
17 08-May-2024 05:00 PM 16-May-2024 12:00 PM 16-May-2024 04:00 PM [84/EDC(KNJ)/2023-24] [84/EDC(KNJ)/2023-24][2024_DVVNL_924394_1] Dakshinanchal Vidyut Vitran Nigam Ltd.
18 08-May-2024 03:45 PM 13-May-2024 04:00 PM 13-May-2024 06:00 PM [Work of Capacity increasing in BP under Najhai Bazar s/s (1x10 MVA to 1x10 and 1x5 MVA)] [04/EWC/JHS/2023-24][2023_DVVNL_870286_2] Dakshinanchal Vidyut Vitran Nigam Ltd.
19 08-May-2024 02:00 PM 21-May-2024 03:30 PM 22-May-2024 01:00 PM [02/EDC(O)/W/2024-25] [02/EDC(O)/W/2024-25][2024_DVVNL_924368_1] Dakshinanchal Vidyut Vitran Nigam Ltd.
20 07-May-2024 05:05 PM 13-May-2024 12:00 PM 13-May-2024 03:00 PM [Increasing capacity of various transformers and installation of extra transformer, earthing, plinth, fencing work under the area of EDC, Lalitpur under Business Plan 2024-25] [47/EDC(L)/2023-24][2024_DVVNL_922749_2] Dakshinanchal Vidyut Vitran Nigam Ltd.
21 07-May-2024 05:00 PM 13-May-2024 01:00 PM 13-May-2024 06:00 PM [The work of saturation (Straightening) of 11 KV Luktara, Jari, Paparenda, Kanwara Feeders under EUDD, Banda (Business Plan 2024-25)] [EDCBNDA-102/2023-24][2024_DVVNL_920275_4] Dakshinanchal Vidyut Vitran Nigam Ltd.
22 07-May-2024 02:00 PM 13-May-2024 12:00 PM 13-May-2024 02:00 PM [Installation of three phase meter on new PTW connections under EDC-II, Mathura] [107/EDC-II(M)/2023-24][2024_DVVNL_922144_4] Dakshinanchal Vidyut Vitran Nigam Ltd.
23 07-May-2024 01:00 PM 13-May-2024 01:00 PM 13-May-2024 03:00 PM [206/EDCE/2023-24] [206/EDCE/2023-24][2024_DVVNL_922767_3] Dakshinanchal Vidyut Vitran Nigam Ltd.
24 07-May-2024 09:00 AM 21-May-2024 12:00 PM 21-May-2024 04:00 PM [Re strengthening and Re Construction of 33 KV Line] [19/EWC/JHS/2023-24][2024_DVVNL_923939_1] Dakshinanchal Vidyut Vitran Nigam Ltd.
25 06-May-2024 06:30 PM 27-May-2024 12:00 PM 27-May-2024 04:00 PM [Construction of 33/11 kv Sub Station and Line] [12/EWC/JHS/2023-24][2024_DVVNL_923927_1] Dakshinanchal Vidyut Vitran Nigam Ltd.
26 06-May-2024 06:00 PM 12-May-2024 06:00 PM 13-May-2024 01:00 PM [02/SE/EDCCKT/2024-25] [02/SE/EDCCKT/2024-25][2024_DVVNL_922247_3] Dakshinanchal Vidyut Vitran Nigam Ltd.
27 06-May-2024 06:00 PM 12-May-2024 06:00 PM 13-May-2024 01:00 PM [43/SE/EDCCKT/2023-24] [43/SE/EDCCKT/2023-24][2023_DVVNL_864219_3] Dakshinanchal Vidyut Vitran Nigam Ltd.
28 06-May-2024 06:00 PM 12-May-2024 06:00 PM 13-May-2024 01:00 PM [42/SE/EDCCKT/2023-24] [42/SE/EDCCKT/2023-24][2023_DVVNL_864207_3] Dakshinanchal Vidyut Vitran Nigam Ltd.
29 05-May-2024 12:00 PM 14-May-2024 12:00 PM 14-May-2024 04:00 PM [01/EDC(A)/2024-25 ] [01/EDC(A)/2024-25][2024_DVVNL_924193_1] Dakshinanchal Vidyut Vitran Nigam Ltd.
30 05-May-2024 12:00 PM 12-May-2024 06:00 PM 13-May-2024 02:00 PM [117/EDC(A)/2023-24] [117/EDC(A)/2023-24][2024_DVVNL_918203_4] Dakshinanchal Vidyut Vitran Nigam Ltd.
31 05-May-2024 12:00 PM 11-May-2024 12:00 PM 11-May-2024 03:00 PM [72/SE/EDCH/2023-24] [72/SE/EDCH/2023-24][2023_DVVNL_859967_12] Dakshinanchal Vidyut Vitran Nigam Ltd.
32 05-May-2024 11:00 AM 12-May-2024 12:00 PM 13-May-2024 04:00 PM [02/EDC(A)/2024-25] [02/EDC(A)/2024-25][2024_DVVNL_924194_1] Dakshinanchal Vidyut Vitran Nigam Ltd.
33 05-May-2024 11:00 AM 14-May-2024 01:00 PM 15-May-2024 04:00 PM [As per tender document] [36/EWC(K)/2023-24][2024_DVVNL_924187_1] Dakshinanchal Vidyut Vitran Nigam Ltd.
34 05-May-2024 11:00 AM 12-May-2024 12:00 PM 13-May-2024 04:00 PM [113/EDC(A)/2023-24] [113/EDC(A)/2023-24][2024_DVVNL_923217_2] Dakshinanchal Vidyut Vitran Nigam Ltd.
35 05-May-2024 09:00 AM 11-May-2024 12:00 PM 11-May-2024 03:00 PM [30/SE/EDCH/2023-24] [30/SE/EDCH/2023-24][2023_DVVNL_845395_11] Dakshinanchal Vidyut Vitran Nigam Ltd.
36 05-May-2024 09:00 AM 11-May-2024 12:00 PM 11-May-2024 03:00 PM [29/SE/EDCH/2023-24] [29/SE/EDCH/2023-24][2023_DVVNL_838545_18] Dakshinanchal Vidyut Vitran Nigam Ltd.
37 05-May-2024 09:00 AM 11-May-2024 12:00 PM 11-May-2024 03:00 PM [69/SE/EDCH/2023-24] [69/SE/EDCH/2023-24][2023_DVVNL_859970_9] Dakshinanchal Vidyut Vitran Nigam Ltd.
38 05-May-2024 09:00 AM 11-May-2024 12:00 PM 11-May-2024 03:00 PM [38/SE/EDCH/2023-24] [38/SE/EDCH/2023-24][2023_DVVNL_835107_15] Dakshinanchal Vidyut Vitran Nigam Ltd.
39 05-May-2024 09:00 AM 11-May-2024 12:00 PM 11-May-2024 03:00 PM [33/SE/EDCH/2023-24] [33/SE/EDCH/2023-24][2023_DVVNL_859971_10] Dakshinanchal Vidyut Vitran Nigam Ltd.
40 04-May-2024 06:00 PM 16-May-2024 12:00 PM 16-May-2024 02:00 PM [REPLACEMENT OF DAMAGED NEW UNDERGROUND 180 METER 33KV XLPE CABLE 3X300 SQMM FOR 33BY11 KV SUBSTATION SIMARAU NEAR ETAWAH MAINPURI ROAD CROSSING KARHAL KOTWALI ALONG WITH 02 Nos END TERMINATION UNDER EDD III MAINPURI] [EDC(M)-81/2023-24][2024_DVVNL_920995_3] Dakshinanchal Vidyut Vitran Nigam Ltd.
41 04-May-2024 06:00 PM 16-May-2024 12:00 PM 16-May-2024 02:00 PM [INSTALLING 33 KV CONTROL PANEL 11 KV INCOMING OUTGOING PANEL CAPACITOR BANK PANEL AND BATTERY INVERTER SET ETC INSTALLED IN THE EXISTING CONTROL ROOM TO THE NEW CONTROL ROOM OF 33BY11 KV SUBSTATION POWER HOUSE UNDER EDD I MAINPURI] [EDC(M)-85/2023-24][2024_DVVNL_921011_3] Dakshinanchal Vidyut Vitran Nigam Ltd.
42 04-May-2024 06:00 PM 16-May-2024 12:00 PM 16-May-2024 02:00 PM [SUPPLY OF PG CLAMPS UNDER EDD III MAINPURI] [EDC(M)-84/2023-24][2024_DVVNL_921007_3] Dakshinanchal Vidyut Vitran Nigam Ltd.
43 04-May-2024 06:00 PM 16-May-2024 12:00 PM 16-May-2024 02:00 PM [LOOSE AB CABLES RESAGGING AND REPLACEMENT OF DAMAGED POLE OF 33 KV AND 11 KV LT LINES AND OTHER WORK UNDER EDD III MAINPURI] [EDC(M)-83/2023-24][2024_DVVNL_921004_3] Dakshinanchal Vidyut Vitran Nigam Ltd.
44 04-May-2024 06:00 PM 16-May-2024 12:00 PM 16-May-2024 02:00 PM [ REPLACEMENT OF DAMAGED PACKING AND REPAIRING OF OIL LECKAGE IN 33BY11 KV SUBSTATION USNIDHA 8MVA SHAHJAHANPUR 5MVA METHEPUR 5MVA AND BHUJIYA 5MVA FOR 04 NOS VARIOUS POWER TRANSFORMER UNDER EDD III MAINPURI ] [EDC(M)-82/2023-24][2024_DVVNL_920998_3] Dakshinanchal Vidyut Vitran Nigam Ltd.
45 04-May-2024 06:00 PM 16-May-2024 12:00 PM 16-May-2024 02:00 PM [ELECTRIFICATION AGAINST SANCTIONED ESTIMATE AND PACKAGE UNDER FULL DEPOSIT UNDER EDD II MAINPURI] [EDC(M)-86/2023-24][2024_DVVNL_921018_3] Dakshinanchal Vidyut Vitran Nigam Ltd.
46 04-May-2024 06:00 PM 16-May-2024 12:00 PM 16-May-2024 02:00 PM [REPAIRING OF DAMAGED JARJAR ST OR GARTER POLE 60 Nos UNDER EDD III MAINPURI] [EDC(M)-80/2023-24][2024_DVVNL_920991_3] Dakshinanchal Vidyut Vitran Nigam Ltd.
47 04-May-2024 06:00 PM 16-May-2024 12:00 PM 16-May-2024 02:00 PM [TROLLY MOUNTED TRANSFORMER HAVING CAPACITY 400KVA TRANSFORMER CARRYING AT VARIOUS SUBSTATIONS UNDER EDD I MAINPURI] [EDC(M)-88/2023-24][2024_DVVNL_921029_3] Dakshinanchal Vidyut Vitran Nigam Ltd.
48 04-May-2024 06:00 PM 16-May-2024 12:00 PM 16-May-2024 02:00 PM [ELECTRIFICATION AGAINST SANCTIONED ESTIMATE AND PACKAGE UNDER FULL DEPOSIT UNDER EDD III MAINPURI] [EDC(M)-87/2023-24][2024_DVVNL_921024_3] Dakshinanchal Vidyut Vitran Nigam Ltd.
49 04-May-2024 06:00 PM 16-May-2024 12:00 PM 16-May-2024 02:00 PM [REPAIRING OF DAMAGED DIFFERENT MAKES 33 AND 11KV VCBs INSTALLED AT VARIOUS 33BY11KV SB UNDER EDD I MAINPURI] [EDC(M)-79/2023-24][2024_DVVNL_920987_3] Dakshinanchal Vidyut Vitran Nigam Ltd.
50 04-May-2024 09:00 AM 16-May-2024 12:00 PM 16-May-2024 06:00 PM [83/EDC(KNJ)/2023-24] [83/EDC(KNJ)/2023-24][2024_DVVNL_924087_1] Dakshinanchal Vidyut Vitran Nigam Ltd.
51 03-May-2024 06:00 PM 15-May-2024 12:00 PM 15-May-2024 02:00 PM [Electrical work related to control panel installation of TPMO Damaged 33 and 11 KV cable jointing kit and state through 33 KV VCB of different sizes at various SB on semiturnkey basis in business plan year 2024-25 Under EDD I_II_III MAINPURI] [EDC(M)-77/2023-24][2024_DVVNL_922747_2] Dakshinanchal Vidyut Vitran Nigam Ltd.
52 03-May-2024 06:00 PM 15-May-2024 12:00 PM 15-May-2024 02:00 PM [Electrical work for laying underground 33 KV cable and installation of poles in midspan and Repair of 33 KV Electrical equipment etc at various SB on semi-turnkey basis in Business Plan Year 2024BY25 Under EDD I_II_III MAINPURI] [EDC(M)-76/2023-24][2024_DVVNL_922746_2] Dakshinanchal Vidyut Vitran Nigam Ltd.
53 03-May-2024 06:00 PM 15-May-2024 12:00 PM 15-May-2024 02:00 PM [Installation of New Distribution Transformer and related Electrical work on Semi Turnkey basis in Business Plan Year 2024BY25 Under Electricity Distribution Division I_II_III District Mainpuri] [EDC(M)-74/2023-24][2024_DVVNL_922743_2] Dakshinanchal Vidyut Vitran Nigam Ltd.
54 03-May-2024 06:00 PM 15-May-2024 12:00 PM 15-May-2024 02:00 PM [Increasing capacity of Distribution Transformers upto 100 KVA and above Capacity on Semi Turnkey basis and related Electrical works in Business Plan Year 2024BY25 Under Electricity Distribution Division-I_II_III Mainpuri] [EDC(M)-73/2023-24][2024_DVVNL_922742_2] Dakshinanchal Vidyut Vitran Nigam Ltd.
55 03-May-2024 06:00 PM 15-May-2024 12:00 PM 15-May-2024 02:00 PM [Installation of LTBYHT protection Tail Less Unit Installation of Distribution Transformers and related electrical works on SemiTurnkey basis in business plan year 2024BY25 Under Electricity Distribution Division I_II_III District mainpuri] [EDC(M)-75/2023-24][2024_DVVNL_922745_2] Dakshinanchal Vidyut Vitran Nigam Ltd.
56 03-May-2024 05:00 PM 17-May-2024 01:00 PM 17-May-2024 04:00 PM [For on site Preventive Maintenance of medium capacity distribution transformer (160 KVA to 1000 KVA) at site of various district under EWD, Banda] [56/2024-25][2024_DVVNL_924074_1] Dakshinanchal Vidyut Vitran Nigam Ltd.
57 03-May-2024 05:00 PM 17-May-2024 01:00 PM 17-May-2024 04:00 PM [For on site Preventive Maintenance of medium capacity distribution transformer (160 KVA to 1000 KVA) at site of various district under EWD, Kanpur] [54/2024-25][2024_DVVNL_924061_1] Dakshinanchal Vidyut Vitran Nigam Ltd.
58 03-May-2024 05:00 PM 17-May-2024 01:00 PM 17-May-2024 04:00 PM [For on site Preventive Maintenance of medium capacity distribution transformer (160 KVA to 1000 KVA) at site of various district under EWD, Jhansi] [55/2024-25][2024_DVVNL_924070_1] Dakshinanchal Vidyut Vitran Nigam Ltd.
59 03-May-2024 04:00 PM 17-May-2024 01:00 PM 17-May-2024 04:00 PM [For on site Preventive Maintenance of medium capacity distribution transformer (160 KVA to 1000 KVA) at site of various district under EWD, Agra] [52/2024-25][2024_DVVNL_924055_1] Dakshinanchal Vidyut Vitran Nigam Ltd.
60 03-May-2024 04:00 PM 17-May-2024 01:00 PM 17-May-2024 04:00 PM [For on site Preventive Maintenance of medium capacity distribution transformer (160 KVA to 1000 KVA) at site of various district under EWD, Aligarh] [53/2024-25][2024_DVVNL_924058_1] Dakshinanchal Vidyut Vitran Nigam Ltd.
61 03-May-2024 02:30 PM 13-May-2024 12:00 PM 13-May-2024 02:00 PM [For the work of LT and HT protection on turn-key basis in the business plan 2024-25 under the area of Electricity Urban Distribution Circle, Firozabad] [EUDC/F/T-49/2023-24][2024_DVVNL_922737_2] Dakshinanchal Vidyut Vitran Nigam Ltd.
62 03-May-2024 09:00 AM 13-May-2024 09:00 AM 13-May-2024 01:00 PM [10/SE/EDCCKT/2024-25] [10/SE/EDCCKT/2024-25][2024_DVVNL_922266_2] Dakshinanchal Vidyut Vitran Nigam Ltd.
63 03-May-2024 09:00 AM 17-May-2024 01:00 PM 18-May-2024 04:00 PM [DVVNL-MM/3540-2024 -11 KV Metering Cubicle] [DVVNL-MM/3540-2024][2024_DVVNL_923953_1] Dakshinanchal Vidyut Vitran Nigam Ltd.
64 02-May-2024 10:00 AM 16-May-2024 10:00 AM 16-May-2024 03:00 PM [PT repair work] [EDC/F/T-03/(2024-25)][2024_DVVNL_923821_1] Dakshinanchal Vidyut Vitran Nigam Ltd.
65 02-May-2024 10:00 AM 16-May-2024 10:00 AM 16-May-2024 03:00 PM [PT repair work] [EDC/F/T-04/(2024-25)][2024_DVVNL_923824_1] Dakshinanchal Vidyut Vitran Nigam Ltd.
66 01-May-2024 09:00 AM 13-May-2024 01:00 PM 13-May-2024 06:00 PM [The work of bifercation of 11 KV Kanwara, Luktara, Pathari Feeders under EUDD, Banda (Business Plan 2024-25)] [EDCBNDA-103/2023-24][2024_DVVNL_920279_3] Dakshinanchal Vidyut Vitran Nigam Ltd.
67 01-May-2024 09:00 AM 13-May-2024 01:00 PM 13-May-2024 06:00 PM [The work of laying of OH XLPE Cable in populated area and replacement of Damaged/Jarjar Conductors of 11 KV Nawab Tank, Pachanehi Feeders etc. under EUDD, Banda (Business Plan 2024-25)] [EDCBNDA-105/2023-24][2024_DVVNL_920281_3] Dakshinanchal Vidyut Vitran Nigam Ltd.
68 01-May-2024 09:00 AM 13-May-2024 01:00 PM 13-May-2024 06:00 PM [The work of installation of addiional DT/increasing capaity of DTs and replacement of damaged UG cable of 11 KV Bhooragarh Feeder and shifting of 11 KV OH to UG under EUDD, Banda (Business Plan 2024-25)] [EDCBNDA-104/2023-24][2024_DVVNL_920280_3] Dakshinanchal Vidyut Vitran Nigam Ltd.
69 30-Apr-2024 06:45 PM 15-May-2024 12:00 PM 15-May-2024 03:00 PM [SEMI TURNKEY WORK OF BUSINESS PLAN 2024-25 UNDER EDD MAURANIPUR] [98/EDC/JHS/2023-24 (BUSINESS PLAN 2024-25)][2024_DVVNL_923747_1] Dakshinanchal Vidyut Vitran Nigam Ltd.
70 30-Apr-2024 06:00 PM 14-May-2024 02:00 PM 14-May-2024 05:00 PM [Work of additional 5 MVA TF in 33/11 kv Bhbarwara s/s INCREASING CAPACITY FROM 5 MVA TO 10 MVA T/F in 33/11 kv kabrai, mahoba (Semi Turn-key)] [SE/ESWC/BANDA/18/2023-24][2024_DVVNL_921114_2] Dakshinanchal Vidyut Vitran Nigam Ltd.
71 30-Apr-2024 06:00 PM 14-May-2024 03:00 PM 14-May-2024 05:00 PM [Electricity System Improvement work under business plan] [76/SE/EDCM/2023-24][2024_DVVNL_922513_2] Dakshinanchal Vidyut Vitran Nigam Ltd.
72 30-Apr-2024 09:00 AM 15-May-2024 12:00 PM 15-May-2024 03:00 PM [SEMI TURNKEY WORK OF BUSINESS PLAN 2024-25 UNDER EDD JHANSI AND MAURANIPUR] [94/EDC/JHS/2023-24 (BUSINESS PLAN 2024-25)][2024_DVVNL_922954_2] Dakshinanchal Vidyut Vitran Nigam Ltd.
73 29-Apr-2024 06:55 PM 15-May-2024 01:00 PM 15-May-2024 05:00 PM [The electrification work of 03 no. Payjal Yojana at Vill. Pailani Dera, Amchauli, Nandadev etc. under EDD, Banda (Rural)] [EDCBNDA-70/2023-24][2024_DVVNL_895830_3] Dakshinanchal Vidyut Vitran Nigam Ltd.
74 29-Apr-2024 06:50 PM 15-May-2024 01:00 PM 15-May-2024 05:00 PM [The electrification work of 11 no. STW at various places/villages under EDD, Banda (Rural)] [EDCBNDA-71/2023-24][2024_DVVNL_895833_2] Dakshinanchal Vidyut Vitran Nigam Ltd.
75 29-Apr-2024 04:00 PM 14-May-2024 01:00 PM 15-May-2024 04:00 PM [Increasing of 33/11 kv S/s Sandila 1x5 to 2x5 MVA ] [50/EWC(K)/2023-24][2024_DVVNL_922727_3] Dakshinanchal Vidyut Vitran Nigam Ltd.
76 29-Apr-2024 04:00 PM 13-May-2024 12:00 PM 13-May-2024 03:00 PM [Supply of A 4 size Century Paper Rim to the office of EE, EUDD III and EE, EUTD, Mathura under the jurisdiction of SE, EUDC, Mathura] [64/EUDC(M)/2023-24][2024_DVVNL_909847_3] Dakshinanchal Vidyut Vitran Nigam Ltd.
77 29-Apr-2024 09:00 AM 13-May-2024 06:00 PM 14-May-2024 12:00 PM [114/EDC(A)/2023-24 ] [114/EDC(A)/2023-24][2024_DVVNL_922808_2] Dakshinanchal Vidyut Vitran Nigam Ltd.
78 29-Apr-2024 09:00 AM 13-May-2024 06:00 PM 14-May-2024 12:00 PM [112/EDC(A)/2023-24 ] [112/EDC(A)/2023-24][2024_DVVNL_922788_2] Dakshinanchal Vidyut Vitran Nigam Ltd.
79 29-Apr-2024 09:00 AM 13-May-2024 06:00 PM 14-May-2024 12:00 PM [111/EDC(A)/2023-24] [111/EDC(A)/2023-24][2024_DVVNL_922786_2] Dakshinanchal Vidyut Vitran Nigam Ltd.
80 29-Apr-2024 09:00 AM 13-May-2024 06:00 PM 14-May-2024 12:00 PM [115/EDC(A)/2023-24] [115/EDC(A)/2023-24][2024_DVVNL_922724_3] Dakshinanchal Vidyut Vitran Nigam Ltd.
81 28-Apr-2024 09:00 AM 14-May-2024 12:00 PM 14-May-2024 03:00 PM [EDC2A-102/2023-24] [EDC2A-102/2023-24][2024_DVVNL_923207_2] Dakshinanchal Vidyut Vitran Nigam Ltd.
82 27-Apr-2024 03:00 PM 15-May-2024 12:00 PM 15-May-2024 03:00 PM [TURNKEY BASIS WORK OF BUSINESS PLAN 2024-25 UNDER EDD JHANSI AND MAURANIPUR] [96/EDC/JHS/2023-24 (BUSINESS PLAN 2024-25)][2024_DVVNL_922894_2] Dakshinanchal Vidyut Vitran Nigam Ltd.
83 27-Apr-2024 03:00 PM 15-May-2024 12:00 PM 15-May-2024 03:00 PM [SEMI TURNKEY WORK OF BUSINESS PLAN 2024-25 UNDER EDD JHANSI AND MAURANIPUR] [93/EDC/JHS/2023-24 (BUSINESS PLAN 2024-25)][2024_DVVNL_922794_2] Dakshinanchal Vidyut Vitran Nigam Ltd.
84 26-Apr-2024 06:30 PM 15-May-2024 12:00 PM 15-May-2024 03:00 PM [SEMI TURNKEY WORK OF BUSINESS PLAN 2024-25 UNDER EDD MAURANIPUR] [92/EDC/JHS/2023-24 (BUSINESS PLAN 2024-25)][2024_DVVNL_922791_2] Dakshinanchal Vidyut Vitran Nigam Ltd.
85 26-Apr-2024 04:30 PM 16-May-2024 12:00 PM 16-May-2024 04:30 PM [Increasing capacity 33, 11 Sub-Station Sulatanganj, Shamserganj, Chauraipur, Manchana, Aramsarai, Bhogaon Dehat and installation of additional 5 MVA Transformer at Bewar Sub station in Distt.- Mainpuri on Semi-Turnkey Basis] [EWCA/T-25 (2023-24)][2024_DVVNL_923430_1] Dakshinanchal Vidyut Vitran Nigam Ltd.
86 26-Apr-2024 01:30 PM 16-May-2024 12:00 PM 16-May-2024 04:30 PM [Increasing capacity 33, 11 Sub-Station Lakhora, Ashokpur Sonai and Simrau in Distt.- Mainpuri on Semi-Turnkey Basis] [EWCA/T-24 (2023-24)][2024_DVVNL_923393_1] Dakshinanchal Vidyut Vitran Nigam Ltd.
87 26-Apr-2024 09:00 AM 13-May-2024 09:00 AM 13-May-2024 02:00 PM [work for increasing capacity of 11/0.4 KV Sub-stations against Additional Business Plan 2024-25 for quality power supply in Aligarh City on Semi Turn-key Basis under the area EUDC, Aligarh] [EUDCA-108/2023-24][2024_DVVNL_923371_1] Dakshinanchal Vidyut Vitran Nigam Ltd.
88 26-Apr-2024 09:00 AM 15-May-2024 12:00 PM 15-May-2024 04:30 PM [Increasing capacity 1x5 MVA to 1x0 MVA at 33, 11 Sub-Station Maant Distt.- Mathura on Semi-Turnkey Basis] [EWC-II/T-18 (2023-24)][2024_DVVNL_923356_1] Dakshinanchal Vidyut Vitran Nigam Ltd.
89 26-Apr-2024 09:00 AM 15-May-2024 12:00 PM 15-May-2024 04:30 PM [Increasing capacity 1x5 MVA to 1x10 MVA at 33, 11 Sub-Station NAUJHIL Distt.- Mathura on Semi-Turnkey Basis] [EWC-II/T-19 (2023-24)][2024_DVVNL_923361_1] Dakshinanchal Vidyut Vitran Nigam Ltd.
90 26-Apr-2024 09:00 AM 13-May-2024 09:00 AM 13-May-2024 02:00 PM [work for augmentation of L.T. Lines against Additional Business Plan 2024-25 for quality power supply in Aligarh City on Semi Turn-key Basis under the area EUDC, Aligarh] [EUDCA-112/2023-24][2024_DVVNL_923373_1] Dakshinanchal Vidyut Vitran Nigam Ltd.
91 26-Apr-2024 09:00 AM 16-May-2024 12:00 PM 16-May-2024 04:30 PM [Installation of Additional 5 MVA Tranformer at 33, 11 KV Sub-Station Lalau and augmenation of 33, 11 Sub-Station Nalga Choora, Distt.- FIROZABAD, on Semi-Turnkey Basis] [EWCA/T-27 (2023-24)][2024_DVVNL_923339_1] Dakshinanchal Vidyut Vitran Nigam Ltd.
92 26-Apr-2024 09:00 AM 16-May-2024 12:00 PM 16-May-2024 04:30 PM [Installation of Additional 5 MVA Tranformer at 33, 11 KV Sub-Station ARAON, Distt.- FIROZABAD, on Semi-Turnkey Basis] [EWCA/T-28 (2023-24)][2024_DVVNL_923333_1] Dakshinanchal Vidyut Vitran Nigam Ltd.
93 26-Apr-2024 09:00 AM 15-May-2024 12:00 PM 15-May-2024 04:30 PM [Increasing capacity 1x5 MVA to 1x10 MVA at 33, 11 Sub-Station Maant Tehsil Distt.- Mathura on Semi-Turnkey Basis As per tender specification] [EWC-II/T-20 (2023-24)][2024_DVVNL_923360_1] Dakshinanchal Vidyut Vitran Nigam Ltd.
94 26-Apr-2024 09:00 AM 15-May-2024 12:00 PM 15-May-2024 04:30 PM [Installation of Additional 5 MVA Tranformer at 33, 11 KV Sub-Station Nagla Bhama Distt.- Mathura on Semi-Turnkey Basis] [EWC-II/T-23 (2023-24)][2024_DVVNL_923363_1] Dakshinanchal Vidyut Vitran Nigam Ltd.
95 26-Apr-2024 09:00 AM 13-May-2024 09:00 AM 13-May-2024 02:00 PM [work for replacement of 33KV and 11 KV VCBs installed at various 33/11 kv Sub-stations against Business Plan 2024-25 for quality power supply in Aligarh City on Semi Turn-key Basis under the area EUDC, Aligarh] [EUDCA-111/2023-24][2024_DVVNL_923372_1] Dakshinanchal Vidyut Vitran Nigam Ltd.
96 26-Apr-2024 09:00 AM 16-May-2024 12:00 PM 16-May-2024 04:30 PM [Installation of Additional 5 MVA Tranformer at 33, 11 KV Sub-Station Nagla Girdhari and augmenation of 33, 11 Sub-Station Usayani, Hazratpur tundla Distt.- FIROZABAD, on Semi-Turnkey Basis] [EWCA/T-26 (2023-24)][2024_DVVNL_923341_1] Dakshinanchal Vidyut Vitran Nigam Ltd.
97 26-Apr-2024 09:00 AM 13-May-2024 09:00 AM 13-May-2024 02:00 PM [work for augmentation of 33KV and 11 KV Lines against Additional Business Plan 2024-25 for quality power supply in Aligarh City on Semi Turn-key Basis under the area EUDC, Aligarh] [EUDCA-106/2023-24][2024_DVVNL_923369_1] Dakshinanchal Vidyut Vitran Nigam Ltd.
98 26-Apr-2024 09:00 AM 13-May-2024 12:00 PM 13-May-2024 03:00 PM [Protection and other inportant work of 33/11KV Substations in the area of EDC, Lalitpur under Business Plan 2024-25] [45/EDC(L)/2023-24][2024_DVVNL_923375_1] Dakshinanchal Vidyut Vitran Nigam Ltd.
99 26-Apr-2024 09:00 AM 13-May-2024 12:00 PM 13-May-2024 03:00 PM [Replacement of Jarjar conductor and other misc. work in the area of EDC, Lalitpur under Business plan 2024-25] [49/EDC(L)/2023-24][2024_DVVNL_923374_1] Dakshinanchal Vidyut Vitran Nigam Ltd.
100 26-Apr-2024 09:00 AM 15-May-2024 12:00 PM 15-May-2024 04:30 PM [Installation of Additional 5 MVA Tranformer at 33, 11 KV Sub-Station Raya Distt.- Mathura on Semi-Turnkey Basis] [ EWC-II/T-24 (2023-24)][2024_DVVNL_923365_1] Dakshinanchal Vidyut Vitran Nigam Ltd.
101 26-Apr-2024 09:00 AM 15-May-2024 12:00 PM 15-May-2024 04:30 PM [Installation of Additional 5 MVA Tranformer at 33, 11 KV Sub-Station Sanchauli Distt.- Mathura on Semi-Turnkey Basis] [EWC-II/T-25 (2023-24)][2024_DVVNL_923367_1] Dakshinanchal Vidyut Vitran Nigam Ltd.
102 26-Apr-2024 09:00 AM 13-May-2024 09:00 AM 13-May-2024 02:00 PM [work for installation of new Distribution Transformers against Additional Business Plan 2024-25 for quality power supply in Aligarh City on Semi Turn-key Basis under the area EUDC, Aligarh] [EUDCA-107/2023-24][2024_DVVNL_923370_1] Dakshinanchal Vidyut Vitran Nigam Ltd.
103 25-Apr-2024 06:00 PM 14-May-2024 12:00 PM 14-May-2024 03:00 PM [Carrying out various electric works on Semi Turn key Basis for increasing capacity of various Distribution Transformer at different places in the area of EE, EUDD-I, II, III, Mathura under the jurisdiction of SE, EUDC, Mathura] [74/EUDC(M)/2023-24][2024_DVVNL_922811_3] Dakshinanchal Vidyut Vitran Nigam Ltd.
104 25-Apr-2024 03:30 PM 15-May-2024 12:00 PM 15-May-2024 04:30 PM [Installation of Additional 5 MVA Transformer at 33,11 KV Sub-Station BHADORA, Distt. AGRA, on Semi-Turnkey Basis] [EWCa/T-31 (2023-24)][2024_DVVNL_923269_1] Dakshinanchal Vidyut Vitran Nigam Ltd.
105 25-Apr-2024 03:00 PM 15-May-2024 12:00 PM 15-May-2024 04:30 PM [Installation of Additional 5 MVA Transformer at 33,11 KV Sub-Station CHAMRAULA, Distt. AGRA, on Semi-Turnkey Basis] [EWCA/T-30 (2023-24)][2024_DVVNL_923255_1] Dakshinanchal Vidyut Vitran Nigam Ltd.
106 25-Apr-2024 02:50 PM 14-May-2024 01:00 PM 14-May-2024 05:00 PM [153/EDCKD/2023-24] [153/EDCKD/2023-24][2024_DVVNL_922568_2] Dakshinanchal Vidyut Vitran Nigam Ltd.
107 25-Apr-2024 02:30 PM 14-May-2024 01:00 PM 14-May-2024 05:00 PM [155/EDCKD/2023-24] [155/EDCKD/2023-24][2024_DVVNL_922620_2] Dakshinanchal Vidyut Vitran Nigam Ltd.
108 25-Apr-2024 02:00 PM 15-May-2024 12:00 PM 15-May-2024 04:30 PM [Augmentation of Power Transformer at 33,11 KV Sub Station in distt. Agra] [EWCA/T-29 (2023-24)][2024_DVVNL_923243_1] Dakshinanchal Vidyut Vitran Nigam Ltd.
109 25-Apr-2024 11:00 AM 11-May-2024 12:00 PM 11-May-2024 04:00 PM [68/EDC(O)/W/2023-24] [68/EDC(O)/W/2023-24][2024_DVVNL_923220_1] Dakshinanchal Vidyut Vitran Nigam Ltd.
110 25-Apr-2024 09:00 AM 14-May-2024 12:00 PM 14-May-2024 04:30 PM [Augmentation of sub station Rangji Bageechaa in Distt. Mathura] [EWC-II/T-21 (2023-24)][2024_DVVNL_923181_1] Dakshinanchal Vidyut Vitran Nigam Ltd.
111 25-Apr-2024 09:00 AM 13-May-2024 12:00 PM 13-May-2024 03:00 PM [Protection of various distribution transformers in the area of EDC, Lalitpur under Business Plan 2024-25.] [46/EDC(L)/2023-24][2024_DVVNL_923209_1] Dakshinanchal Vidyut Vitran Nigam Ltd.
112 25-Apr-2024 09:00 AM 13-May-2024 12:00 PM 13-May-2024 03:00 PM [Strengthning of 11kV and 33kV line into area of EDC, Lalitpur under Business Plan 2024-25.] [48/EDC(L)/2023-24][2024_DVVNL_923208_1] Dakshinanchal Vidyut Vitran Nigam Ltd.
113 25-Apr-2024 09:00 AM 14-May-2024 12:00 PM 14-May-2024 03:00 PM [EDC2A-99/2023-24] [EDC2A-99/2023-24][2024_DVVNL_923170_1] Dakshinanchal Vidyut Vitran Nigam Ltd.
114 25-Apr-2024 09:00 AM 13-May-2024 12:00 PM 13-May-2024 03:00 PM [Work of Strengthening of 33 KV Protection and Metering system of various 33/11 KV sub stations under the jurisdiction of EDC Etah on BP 2024-25.] [128/2023-24/EDC ETAH][2024_DVVNL_923177_1] Dakshinanchal Vidyut Vitran Nigam Ltd.
115 25-Apr-2024 09:00 AM 15-May-2024 12:00 PM 15-May-2024 03:00 PM [EDCA-99/2023-24] [EDCA-99/2023-24][2024_DVVNL_923211_1] Dakshinanchal Vidyut Vitran Nigam Ltd.
116 25-Apr-2024 09:00 AM 15-May-2024 12:00 PM 15-May-2024 03:00 PM [EDCA-100/2023-24] [EDCA-100/2023-24][2024_DVVNL_923197_1] Dakshinanchal Vidyut Vitran Nigam Ltd.
117 25-Apr-2024 09:00 AM 14-May-2024 12:00 PM 14-May-2024 04:30 PM [Augmentation of sub station Bichpuri, Dura, Kagarol, NAGLA KAMAL, Kukthala in distt. Agra] [EWC-II/T-27 (2023-24)][2024_DVVNL_923172_1] Dakshinanchal Vidyut Vitran Nigam Ltd.
118 24-Apr-2024 06:00 PM 14-May-2024 01:00 PM 14-May-2024 03:00 PM [T-112] [112/EDC-I(M)/2023-24][2024_DVVNL_923122_2] Dakshinanchal Vidyut Vitran Nigam Ltd.
119 24-Apr-2024 06:00 PM 14-May-2024 01:00 PM 14-May-2024 03:00 PM [T-113] [113/EDC-I(M)/2023-24][2024_DVVNL_923164_1] Dakshinanchal Vidyut Vitran Nigam Ltd.
120 24-Apr-2024 05:45 PM 14-May-2024 12:00 PM 14-May-2024 04:30 PM [Installation of 5 MVA Additional power Transformerof at 33 11 KV Sub station BAD on on semi turnkey basis] [EWC-II/T-26 (2023-24)][2024_DVVNL_923160_1] Dakshinanchal Vidyut Vitran Nigam Ltd.
121 24-Apr-2024 05:00 PM 13-May-2024 12:00 PM 13-May-2024 04:30 PM [33 KV Dhanota Link Line from 220 KV Sub station UPSIDC Kosi in Distt Mathura] [EWC-II/T-10 (2023-24)][2024_DVVNL_922697_2] Dakshinanchal Vidyut Vitran Nigam Ltd.
122 24-Apr-2024 05:00 PM 17-May-2024 01:00 PM 17-May-2024 04:00 PM [For Repairing of 10/16 KVA to 400 KVA Transformer at Workshop Charkhari (Mahoba) under EWD, Banda] [51/2024-25][2024_DVVNL_920741_2] Dakshinanchal Vidyut Vitran Nigam Ltd.
123 24-Apr-2024 04:30 PM 13-May-2024 12:00 PM 13-May-2024 04:30 PM [33 KV Mubarikpur Line from 220 KV Sub station Kiraoli in Distt. Agra] [EWC-II/T-08 (2023-24)][2024_DVVNL_922684_2] Dakshinanchal Vidyut Vitran Nigam Ltd.
124 24-Apr-2024 04:00 PM 13-May-2024 12:00 PM 13-May-2024 04:30 PM [33 KV Sadhan Line from 220 KV Sub station Kirawali in Distt. Agra] [EWC-II/T-06 (2023-24)][2024_DVVNL_922317_2] Dakshinanchal Vidyut Vitran Nigam Ltd.
125 24-Apr-2024 01:00 PM 13-May-2024 03:00 PM 13-May-2024 05:00 PM [Supply and installation work of 11 KV D.O Fuse Set under EDD-II Mahoba.( BP 2024-25) Semi-Turnky] [88/SE/EDCM/2023-24][2024_DVVNL_923089_1] Dakshinanchal Vidyut Vitran Nigam Ltd.
126 24-Apr-2024 12:55 PM 16-May-2024 03:00 PM 16-May-2024 05:00 PM [Supply and installation work of 11 KV D.O Fuse Set under EDD-I Mahoba.( BP 2024-25) Semi-Turnky Basis.] [87/SE/EDCM/2023-24][2024_DVVNL_923073_1] Dakshinanchal Vidyut Vitran Nigam Ltd.
127 24-Apr-2024 11:40 AM 13-May-2024 03:00 PM 13-May-2024 05:00 PM [Supply and installation work of 300 amp tailless unit in LT site of 63 KVA distribution transformer under EDD-II Mahoba.( BP 2024-25) Semi-Turnky Basis.] [86/SE/EDCM/2023-24][2024_DVVNL_923062_1] Dakshinanchal Vidyut Vitran Nigam Ltd.
128 24-Apr-2024 11:15 AM 13-May-2024 03:00 PM 13-May-2024 05:00 PM [Supply and installation work of 300/500 amp tailless unit in LT site of 160/250/400/630 KVA distribution transformer under EDD-II Mahoba.( BP 2024-25) Semi-Turnky Basis.] [85/SE/EDCM/2023-24][2024_DVVNL_923061_1] Dakshinanchal Vidyut Vitran Nigam Ltd.
129 24-Apr-2024 11:00 AM 15-May-2024 01:00 PM 16-May-2024 04:00 PM [37/EWC(K)/2023-24] [37/EWC(K)/2023-24][2024_DVVNL_923026_1] Dakshinanchal Vidyut Vitran Nigam Ltd.
130 24-Apr-2024 11:00 AM 15-May-2024 01:00 PM 16-May-2024 04:00 PM [38/EWC(K)/2023-24] [38/EWC(K)/2023-24][2024_DVVNL_923035_1] Dakshinanchal Vidyut Vitran Nigam Ltd.
131 24-Apr-2024 11:00 AM 13-May-2024 03:00 PM 13-May-2024 05:00 PM [Supply and installation work of 300 amp tailless unit in LT site of 100 KVA distribution transformer under EDD-II Mahoba.( BP 2024-25) Semi-Turnky Basis.] [84/SE/EDCM/2023-24][2024_DVVNL_923059_1] Dakshinanchal Vidyut Vitran Nigam Ltd.
132 24-Apr-2024 10:35 AM 13-May-2024 03:00 PM 13-May-2024 05:00 PM [Supply and installation work of 300 amp tailless unit in LT site of 63 KVA distribution transformer under EDD-II Mahoba.( BP 2024-25) Semi-Turnky Basis.] [83/SE/EDCM/2023-24][2024_DVVNL_923058_1] Dakshinanchal Vidyut Vitran Nigam Ltd.
133 24-Apr-2024 10:00 AM 16-May-2024 03:00 PM 16-May-2024 05:00 PM [Supply and installation work of 300 amp tailless unit in LT site of 100 KVA distribution transformer under EDD-I Mahoba.( BP 2024-25) Semi-Turnky Basis.] [81/SE/EDCM/2023-24][2024_DVVNL_923055_1] Dakshinanchal Vidyut Vitran Nigam Ltd.
134 24-Apr-2024 10:00 AM 15-May-2024 01:00 PM 15-May-2024 03:00 PM [For Strengthening the protection system of electrical infrastructure at various 33/11 KV S/s nd other assocaites works in Buisness Plan 2024-25 on Semi Turn Key Basis under EDC-1 Agra.] [92/EDCA/2023-24][2024_DVVNL_923009_1] Dakshinanchal Vidyut Vitran Nigam Ltd.
135 24-Apr-2024 09:55 AM 16-May-2024 03:00 PM 16-May-2024 05:00 PM [Supply and installation work of 300 amp tailless unit in LT site of 63 KVA distribution transformer under EDD-I Mahoba.( BP 2024-25) Semi-Turnky Basis.] [80/SE/EDCM/2023-24][2024_DVVNL_923029_1] Dakshinanchal Vidyut Vitran Nigam Ltd.
136 24-Apr-2024 09:00 AM 14-May-2024 12:00 PM 14-May-2024 03:00 PM [EDC2A-98/2023-24] [EDC2A-98/2023-24][2024_DVVNL_922967_1] Dakshinanchal Vidyut Vitran Nigam Ltd.
137 24-Apr-2024 09:00 AM 14-May-2024 12:00 PM 14-May-2024 03:00 PM [EDC2A-100/2023-24] [EDC2A-100/2023-24][2024_DVVNL_923031_1] Dakshinanchal Vidyut Vitran Nigam Ltd.
138 24-Apr-2024 09:00 AM 13-May-2024 11:00 AM 13-May-2024 04:00 PM [LT/Substation protection and other works] [53/EUDC/JHS/2023-24][2024_DVVNL_923049_1] Dakshinanchal Vidyut Vitran Nigam Ltd.
139 24-Apr-2024 09:00 AM 11-May-2024 12:00 PM 11-May-2024 04:00 PM [71/EDC(O)/W/2023-24 ] [71/EDC(O)/W/2023-24][2024_DVVNL_923032_1] Dakshinanchal Vidyut Vitran Nigam Ltd.
140 24-Apr-2024 09:00 AM 13-May-2024 11:00 AM 13-May-2024 04:00 PM [LT/Substation protection and other works] [54/EUDC/JHS/2023-24][2024_DVVNL_923048_1] Dakshinanchal Vidyut Vitran Nigam Ltd.
141 24-Apr-2024 09:00 AM 14-May-2024 12:00 PM 14-May-2024 03:00 PM [EDC2A-105/2023-24] [EDC2A-105/2023-24][2024_DVVNL_922971_1] Dakshinanchal Vidyut Vitran Nigam Ltd.
142 23-Apr-2024 06:20 PM 15-May-2024 12:00 PM 15-May-2024 03:00 PM [SEMI TURNKEY WORK OF BUSINESS PLAN 2024-25 UNDER EDD JHANSI AND MAURANIPUR] [97/EDC/JHS/2023-24 (BUSINESS PLAN 2024-25)][2024_DVVNL_922991_1] Dakshinanchal Vidyut Vitran Nigam Ltd.
143 23-Apr-2024 05:00 PM 13-May-2024 11:00 AM 13-May-2024 04:00 PM [work of Strenthening of 11kv Over loaded Feder in and construction of New line under EE EUDD II Jhansi in Business Plan 2024 25 ] [50/EUDC/JHS/2023-24][2024_DVVNL_922973_1] Dakshinanchal Vidyut Vitran Nigam Ltd.
144 23-Apr-2024 04:00 PM 11-May-2024 12:00 PM 11-May-2024 04:00 PM [70/EDC(O)/W/2023-24] [70/EDC(O)/W/2023-24][2024_DVVNL_922919_2] Dakshinanchal Vidyut Vitran Nigam Ltd.
145 23-Apr-2024 03:00 PM 13-May-2024 02:00 PM 14-May-2024 02:00 PM [ESWCA-23/2023-24] [ESWCA-23/2023-24][2024_DVVNL_921912_3] Dakshinanchal Vidyut Vitran Nigam Ltd.
146 23-Apr-2024 02:30 PM 15-May-2024 01:00 PM 16-May-2024 04:00 PM [59/EWC(K)/2023-24] [59/EWC(K)/2023-24][2024_DVVNL_922938_1] Dakshinanchal Vidyut Vitran Nigam Ltd.
147 23-Apr-2024 02:00 PM 15-May-2024 01:00 PM 16-May-2024 04:00 PM [58/EWC(K)/2023-24] [58/EWC(K)/2023-24][2024_DVVNL_922925_1] Dakshinanchal Vidyut Vitran Nigam Ltd.
148 23-Apr-2024 02:00 PM 13-May-2024 11:00 AM 13-May-2024 04:00 PM [work of Strenthening of 11kv Over loaded Feder in and construction of New line under EE EUDD I Jhansi in Business Plan 2024 25 ] [49/EUDC/JHS/2023-24][2024_DVVNL_922926_1] Dakshinanchal Vidyut Vitran Nigam Ltd.
149 23-Apr-2024 01:30 PM 14-May-2024 01:00 PM 15-May-2024 04:00 PM [57/EWC(K)/2023-24] [57/EWC(K)/2023-24][2024_DVVNL_922923_1] Dakshinanchal Vidyut Vitran Nigam Ltd.
150 23-Apr-2024 10:00 AM 15-May-2024 01:00 PM 15-May-2024 03:00 PM [For the work of making and strengthening of 33 KV, 11 KV nd LT Lines, VCBs Installation/Repair nd other assocaites works in Buisness Plan 2024-25 on Semi Turn Key Basis under EDC-1 Agra] [91/EDCA/2023-24][2024_DVVNL_922904_1] Dakshinanchal Vidyut Vitran Nigam Ltd.
151 23-Apr-2024 09:00 AM 13-May-2024 12:00 PM 13-May-2024 03:00 PM [Work of bifurcation of 11 KV overload feeder and strengthening of LT Line in the area of EDC Etah under Business Plan 2024-25 on Semi Turnkey basis.] [126/2023-24/EDC ETAH][2024_DVVNL_922901_1] Dakshinanchal Vidyut Vitran Nigam Ltd.
152 23-Apr-2024 09:00 AM 16-May-2024 12:00 PM 16-May-2024 06:00 PM [101/EDC(KNJ)/2023-24] [101/EDC(KNJ)/2023-24][2024_DVVNL_922903_1] Dakshinanchal Vidyut Vitran Nigam Ltd.
153 23-Apr-2024 09:00 AM 13-May-2024 12:00 PM 13-May-2024 03:00 PM [Work of increasing capacity of TF, Installation of New TF, 11 KV/LT Line erection and strengthening of other work in the area of EDC Etah under Business Plan 2024-25 on Semi Turnkey basis.] [125/2023-24/EDC ETAH][2024_DVVNL_922899_1] Dakshinanchal Vidyut Vitran Nigam Ltd.
154 23-Apr-2024 09:00 AM 14-May-2024 01:00 PM 15-May-2024 04:00 PM [56/EWC(K)/2023-24] [56/EWC(K)/2023-24][2024_DVVNL_922884_1] Dakshinanchal Vidyut Vitran Nigam Ltd.
155 22-Apr-2024 06:55 PM 14-May-2024 01:00 PM 15-May-2024 04:00 PM [55/EWC(K)/2023-24] [55/EWC(K)/2023-24][2024_DVVNL_922867_1] Dakshinanchal Vidyut Vitran Nigam Ltd.
156 22-Apr-2024 06:45 PM 13-May-2024 11:00 AM 13-May-2024 04:00 PM [Capacity Increasing of Transformer Under EE EUDD II JHS in Business Plan 2024-25] [52/EUDC/JHS/2023-24][2024_DVVNL_922881_1] Dakshinanchal Vidyut Vitran Nigam Ltd.
157 22-Apr-2024 06:45 PM 15-May-2024 12:00 PM 15-May-2024 03:00 PM [Invited Tender Notice] [95/EDC/JHS/2023-24 (BUSINESS PLAN 2024-25)][2024_DVVNL_922877_1] Dakshinanchal Vidyut Vitran Nigam Ltd.
158 22-Apr-2024 06:00 PM 15-May-2024 01:00 PM 16-May-2024 04:00 PM [54/EWC(K)/2023-24] [54/EWC(K)/2023-24][2024_DVVNL_922852_1] Dakshinanchal Vidyut Vitran Nigam Ltd.
159 22-Apr-2024 05:40 PM 11-May-2024 12:00 PM 11-May-2024 04:00 PM [72/EDC(O)/W/2023-24] [72/EDC(O)/W/2023-24][2024_DVVNL_922863_1] Dakshinanchal Vidyut Vitran Nigam Ltd.
160 22-Apr-2024 05:00 PM 16-May-2024 01:00 PM 17-May-2024 04:00 PM [52/EWC(K)/2023-24] [52/EWC(K)/2023-24][2024_DVVNL_922736_2] Dakshinanchal Vidyut Vitran Nigam Ltd.
161 22-Apr-2024 05:00 PM 15-May-2024 01:00 PM 15-May-2024 03:00 PM [For the work of Increasing Capacity of Different Type Distribution TFs, Installation of New Distribution TFs and making of 11 KV/LT lines nd other associates works in Business Plan 2024-25 on Semi Turn Key Basis under EDC-1 Agra] [93/EDCA/2023-24][2024_DVVNL_922817_1] Dakshinanchal Vidyut Vitran Nigam Ltd.
162 22-Apr-2024 05:00 PM 16-May-2024 01:00 PM 17-May-2024 04:00 PM [51/EWC(K)/2023-24] [51/EWC(K)/2023-24][2024_DVVNL_922733_2] Dakshinanchal Vidyut Vitran Nigam Ltd.
163 22-Apr-2024 04:00 PM 14-May-2024 12:00 PM 14-May-2024 02:00 PM [EDCH-182/2023-24] [EDCH-182/2023-24][2024_DVVNL_921681_3] Dakshinanchal Vidyut Vitran Nigam Ltd.
164 22-Apr-2024 04:00 PM 14-May-2024 12:00 PM 14-May-2024 02:00 PM [EDCH-186/2023-24] [EDCH-186/2023-24][2024_DVVNL_921693_2] Dakshinanchal Vidyut Vitran Nigam Ltd.
165 22-Apr-2024 03:00 PM 16-May-2024 01:00 PM 17-May-2024 04:00 PM [49/EWC(K)/2023-24] [49/EWC(K)/2023-24][2024_DVVNL_922698_2] Dakshinanchal Vidyut Vitran Nigam Ltd.
166 22-Apr-2024 02:00 PM 13-May-2024 11:00 AM 13-May-2024 04:00 PM [Capacity Increasing of Transformer Under EE EUDD I JHS in Business Plan 2024-25] [51/EUDC/JHS/2023-24][2024_DVVNL_922829_1] Dakshinanchal Vidyut Vitran Nigam Ltd.
167 22-Apr-2024 09:00 AM 13-May-2024 06:00 PM 14-May-2024 12:00 PM [ 110/EDC(A)/2023-24 ] [110/EDC(A)/2023-24][2024_DVVNL_922807_1] Dakshinanchal Vidyut Vitran Nigam Ltd.
168 22-Apr-2024 09:00 AM 15-May-2024 12:00 PM 15-May-2024 03:00 PM [EDCA-101/2023-24] [EDCA-101/2023-24][2024_DVVNL_922799_1] Dakshinanchal Vidyut Vitran Nigam Ltd.
169 22-Apr-2024 09:00 AM 11-May-2024 12:00 PM 11-May-2024 04:00 PM [69/EDC(O)/W/2023-24] [69/EDC(O)/W/2023-24][2024_DVVNL_922798_1] Dakshinanchal Vidyut Vitran Nigam Ltd.
170 21-Apr-2024 06:30 PM 14-May-2024 06:00 PM 15-May-2024 03:00 PM [257/EDCK/2023-24] [257/EDCK/2023-24][2024_DVVNL_922795_1] Dakshinanchal Vidyut Vitran Nigam Ltd.
171 21-Apr-2024 06:00 PM 13-May-2024 12:00 PM 13-May-2024 02:00 PM [EDCK-92/2023-24] [EDCK-92/2023-24][2024_DVVNL_922780_2] Dakshinanchal Vidyut Vitran Nigam Ltd.
172 21-Apr-2024 05:00 PM 14-May-2024 12:00 PM 14-May-2024 03:00 PM [EDC2A-103/2023-24] [EDC2A-103/2023-24][2024_DVVNL_922782_1] Dakshinanchal Vidyut Vitran Nigam Ltd.
173 21-Apr-2024 05:00 PM 14-May-2024 06:00 PM 15-May-2024 03:00 PM [258/EDCK/2023-24] [258/EDCK/2023-24][2024_DVVNL_922649_2] Dakshinanchal Vidyut Vitran Nigam Ltd.
174 21-Apr-2024 05:00 PM 14-May-2024 06:00 PM 15-May-2024 03:00 PM [259/EDCK/2023-24] [259/EDCK/2023-24][2024_DVVNL_922712_2] Dakshinanchal Vidyut Vitran Nigam Ltd.
175 21-Apr-2024 05:00 PM 14-May-2024 12:00 PM 14-May-2024 03:00 PM [EDC2A-104/2023-24] [EDC2A-104/2023-24][2024_DVVNL_922783_1] Dakshinanchal Vidyut Vitran Nigam Ltd.
176 21-Apr-2024 03:00 PM 14-May-2024 06:00 PM 15-May-2024 03:00 PM [260/EDCK/2023-24] [260/EDCK/2023-24][2024_DVVNL_922744_1] Dakshinanchal Vidyut Vitran Nigam Ltd.
177 21-Apr-2024 12:00 PM 13-May-2024 12:00 PM 13-May-2024 03:00 PM [for the work of purchase and installation of HT and LT protection ex- tailless unit, DO fuse set in various Electricity Distribution Division Firozabad, Shikohabad, Sirsaganj, Jasrana and Tundla under of jusirsdiction of Electricity Distribution Circ] [EDC/F/T-84 (2023-24)][2024_DVVNL_922719_1] Dakshinanchal Vidyut Vitran Nigam Ltd.
178 21-Apr-2024 12:00 PM 13-May-2024 12:00 PM 13-May-2024 03:00 PM [for the work of replacement of dilapidated wires and poles, work of electrical strengthening and other related work in various Electricity Distribution Division, Firozabad, Shikohabad, Sirsaganj, Jasrana and Tundla under the jurisdiction of Electrici] [EDC/F/T-86 (2023-24)][2024_DVVNL_922722_1] Dakshinanchal Vidyut Vitran Nigam Ltd.
179 21-Apr-2024 12:00 PM 13-May-2024 12:00 PM 13-May-2024 03:00 PM [for the work of purchase and installation of related to 33 KV protection etc in various Electricity Distribution Division Firozabad, Shikohabad, Sirsaganj, Jasrana and Tundla under of jusirsdiction of Electricity Distribution Circle, Firozabad On sem] [EDC/F/T-85 (2023-24)][2024_DVVNL_922721_1] Dakshinanchal Vidyut Vitran Nigam Ltd.
180 21-Apr-2024 11:00 AM 16-May-2024 01:00 PM 17-May-2024 04:00 PM [53/EWC(K)/2023-24] [53/EWC(K)/2023-24][2024_DVVNL_922740_1] Dakshinanchal Vidyut Vitran Nigam Ltd.
181 21-Apr-2024 09:00 AM 15-May-2024 12:00 PM 15-May-2024 03:00 PM [EDCA-94/2023-24] [EDCA-94/2023-24][2024_DVVNL_922735_1] Dakshinanchal Vidyut Vitran Nigam Ltd.
182 20-Apr-2024 03:30 PM 16-May-2024 12:00 PM 16-May-2024 06:00 PM [103/EDC(KNJ)/2023-24] [103/EDC(KNJ)/2023-24][2024_DVVNL_922658_1] Dakshinanchal Vidyut Vitran Nigam Ltd.
183 20-Apr-2024 02:30 PM 16-May-2024 12:00 PM 16-May-2024 06:00 PM [102/EDC(KNJ)/2023-24] [102/EDC(KNJ)/2023-24][2024_DVVNL_922640_1] Dakshinanchal Vidyut Vitran Nigam Ltd.
184 20-Apr-2024 09:00 AM 13-May-2024 12:00 PM 14-May-2024 02:00 PM [ESWCA-01/2024-25] [ESWCA-01/2024-25][2024_DVVNL_922603_1] Dakshinanchal Vidyut Vitran Nigam Ltd.
185 19-Apr-2024 05:00 PM 15-May-2024 01:00 PM 15-May-2024 03:00 PM [FOR THE WORK OF INSTALLATION AND REPLACEMENT OF OLD/DAMAGED 11 KV CT-PT COMBINED METERING UNITS UNDER EDC-1 AGRA.] [06/EDCA/2024-25][2024_DVVNL_922582_1] Dakshinanchal Vidyut Vitran Nigam Ltd.
186 19-Apr-2024 04:00 PM 14-May-2024 01:00 PM 14-May-2024 05:00 PM [159/23-24] [159/EDCKD/2023-24][2024_DVVNL_922575_1] Dakshinanchal Vidyut Vitran Nigam Ltd.
187 19-Apr-2024 09:00 AM 15-May-2024 01:00 PM 15-May-2024 05:00 PM [Heavy Storm related works under EDD, Atarra] [EDCBNDA-100/2023-24][2024_DVVNL_912044_3] Dakshinanchal Vidyut Vitran Nigam Ltd.
188 19-Apr-2024 09:00 AM 15-May-2024 01:00 PM 15-May-2024 05:00 PM [Full Deposit related Mixed works under EDD, Atarra] [EDCBNDA-106/2023-24][2024_DVVNL_919861_4] Dakshinanchal Vidyut Vitran Nigam Ltd.
189 19-Apr-2024 09:00 AM 15-May-2024 01:00 PM 15-May-2024 05:00 PM [Shifting work of electrical utilities due to widening of road from vill. Badausa to Pauhar Road under EDD, Atarra] [EDCBNDA-101/2023-24][2024_DVVNL_912045_3] Dakshinanchal Vidyut Vitran Nigam Ltd.
190 18-Apr-2024 06:55 PM 15-May-2024 01:00 PM 15-May-2024 05:00 PM [Maintenance and repairing/wiring work of OCB/VCB/Relay under EUDD, Banda] [EDCBNDA-97/2023-24][2024_DVVNL_912040_2] Dakshinanchal Vidyut Vitran Nigam Ltd.
191 18-Apr-2024 06:50 PM 15-May-2024 01:00 PM 15-May-2024 05:00 PM [Supply of Ashida Relay and Master Trip Relay for used in ETD, Banda] [EDCBNDA-95/2023-24][2024_DVVNL_912035_2] Dakshinanchal Vidyut Vitran Nigam Ltd.
192 16-Apr-2024 06:00 PM 13-May-2024 09:00 AM 13-May-2024 02:00 PM [Providing of Diesel CAR having good condition with driver for 01.04.2024 to] [EUDCA-99/2023-24][2024_DVVNL_915031_3] Dakshinanchal Vidyut Vitran Nigam Ltd.
193 16-Apr-2024 06:00 PM 13-May-2024 09:00 AM 13-May-2024 02:00 PM [REPLACEMENT OF DAMAGED DISTRIBUTION TRANSFORMERS WITHIN THE] [EUDCA-116/2023-24][2024_DVVNL_921393_2] Dakshinanchal Vidyut Vitran Nigam Ltd.
194 13-Apr-2024 03:00 PM 11-May-2024 12:00 PM 11-May-2024 02:00 PM [EDCH-172/2023-24] [EDCH-172/2023-24][2024_DVVNL_922172_1] Dakshinanchal Vidyut Vitran Nigam Ltd.
195 13-Apr-2024 12:00 PM 14-May-2024 03:30 PM 15-May-2024 01:00 PM [57/EDC(O)/P/2023-24 ] [57/EDC(O)/P/2023-24][2024_DVVNL_893799_3] Dakshinanchal Vidyut Vitran Nigam Ltd.
196 12-Apr-2024 04:00 PM 11-May-2024 03:30 PM 12-May-2024 01:00 PM [01/EDC(O)/S/2024-25] [ 01/EDC(O)/S/2024-25][2024_DVVNL_922095_1] Dakshinanchal Vidyut Vitran Nigam Ltd.
197 10-Apr-2024 10:00 AM 14-May-2024 04:00 PM 15-May-2024 03:00 PM [210/ECC(D)Ag/2023-24] [210/ECC(D)Ag/2023-24][2024_DVVNL_918499_2] Dakshinanchal Vidyut Vitran Nigam Ltd.
198 09-Apr-2024 09:00 AM 14-May-2024 12:00 PM 14-May-2024 02:00 PM [EDCH-203/2023-24] [EDCH-203/2023-24][2024_DVVNL_921773_1] Dakshinanchal Vidyut Vitran Nigam Ltd.
199 07-Apr-2024 04:30 PM 13-May-2024 01:00 PM 13-May-2024 06:00 PM [Installation of additional/new 33 KV/11 KV VCB Pannels under EDD, Banda] [EDCBNDA-66/2023-24][2024_DVVNL_883802_4] Dakshinanchal Vidyut Vitran Nigam Ltd.
200 07-Apr-2024 10:00 AM 17-May-2024 04:00 PM 18-May-2024 03:00 PM [216/ECC(D)Ag/2023-24] [216/ECC(D)Ag/2023-24][2024_DVVNL_921705_1] Dakshinanchal Vidyut Vitran Nigam Ltd.
201 07-Apr-2024 10:00 AM 17-May-2024 04:00 PM 18-May-2024 03:00 PM [220/ECC(D)Ag/2023-24 ] [220/ECC(D)Ag/2023-24][2024_DVVNL_921715_1] Dakshinanchal Vidyut Vitran Nigam Ltd.
202 07-Apr-2024 10:00 AM 17-May-2024 04:00 PM 18-May-2024 03:00 PM [217/ECC(D)Ag/2023-24] [217/ECC(D)Ag/2023-24][2024_DVVNL_921708_1] Dakshinanchal Vidyut Vitran Nigam Ltd.
203 07-Apr-2024 10:00 AM 17-May-2024 04:00 PM 18-May-2024 03:00 PM [215/ECC(D)Ag/2023-24] [215/ECC(D)Ag/2023-24][2024_DVVNL_921700_1] Dakshinanchal Vidyut Vitran Nigam Ltd.
204 07-Apr-2024 10:00 AM 17-May-2024 04:00 PM 18-May-2024 03:00 PM [218/ECC(D)Ag/2023-24] [218/ECC(D)Ag/2023-24][2024_DVVNL_921713_1] Dakshinanchal Vidyut Vitran Nigam Ltd.
205 07-Apr-2024 10:00 AM 17-May-2024 04:00 PM 18-May-2024 03:00 PM [219/ECC(D)Ag/2023-24] [219/ECC(D)Ag/2023-24][2024_DVVNL_921714_1] Dakshinanchal Vidyut Vitran Nigam Ltd.
206 07-Apr-2024 09:00 AM 14-May-2024 12:00 PM 14-May-2024 02:00 PM [EDCH-185/2023-24] [EDCH-185/2023-24][2024_DVVNL_921689_1] Dakshinanchal Vidyut Vitran Nigam Ltd.
207 07-Apr-2024 09:00 AM 14-May-2024 12:00 PM 14-May-2024 03:00 PM [Work of Maintenance of HT/LT lines] [111/2023-24/EDC ETAH][2024_DVVNL_897031_3] Dakshinanchal Vidyut Vitran Nigam Ltd.
208 07-Apr-2024 09:00 AM 14-May-2024 12:00 PM 14-May-2024 02:00 PM [EDCH-183/2023-24] [EDCH-183/2023-24][2024_DVVNL_921684_1] Dakshinanchal Vidyut Vitran Nigam Ltd.
209 07-Apr-2024 09:00 AM 14-May-2024 12:00 PM 14-May-2024 02:00 PM [EDCH-181/2023-24] [EDCH-181/2023-24][2024_DVVNL_921678_1] Dakshinanchal Vidyut Vitran Nigam Ltd.
210 07-Apr-2024 09:00 AM 14-May-2024 12:00 PM 14-May-2024 03:00 PM [Work of Maintenance of HT/LT lines] [109/2023-24/EDC ETAH][2024_DVVNL_896864_3] Dakshinanchal Vidyut Vitran Nigam Ltd.
211 07-Apr-2024 09:00 AM 14-May-2024 12:00 PM 14-May-2024 03:00 PM [Carriage and replacement of damaged Low Power TF of different capacity] [96/2023-24/EDC ETAH][2023_DVVNL_871596_4] Dakshinanchal Vidyut Vitran Nigam Ltd.
212 07-Apr-2024 09:00 AM 14-May-2024 12:00 PM 14-May-2024 03:00 PM [Work of Maintenance of HT/LT lines] [110/2023-24/EDC ETAH][2024_DVVNL_896921_3] Dakshinanchal Vidyut Vitran Nigam Ltd.
213 07-Apr-2024 09:00 AM 14-May-2024 12:00 PM 14-May-2024 03:00 PM [Carriage and replacement of damaged Low Power TF of different capacity] [94/2023-24/EDC ETAH][2023_DVVNL_871594_4] Dakshinanchal Vidyut Vitran Nigam Ltd.
214 06-Apr-2024 06:55 PM 14-May-2024 01:00 PM 15-May-2024 04:00 PM [DVVNL-MM/3534-2024 Different size of G.I. Wires] [DVVNL-MM/3534-2024][2024_DVVNL_920189_2] Dakshinanchal Vidyut Vitran Nigam Ltd.
215 06-Apr-2024 06:55 PM 14-May-2024 01:00 PM 15-May-2024 04:00 PM [DVVNL-MM/3518-2024 33 KV Disc Insulator Fitting] [DVVNL-MM/3518-2024][2024_DVVNL_920096_2] Dakshinanchal Vidyut Vitran Nigam Ltd.
216 06-Apr-2024 09:00 AM 14-May-2024 12:00 PM 14-May-2024 02:00 PM [EDCH-162/2023-24] [EDCH-162/2023-24][2024_DVVNL_901216_3] Dakshinanchal Vidyut Vitran Nigam Ltd.
217 06-Apr-2024 09:00 AM 14-May-2024 12:00 PM 14-May-2024 02:00 PM [EDCH-161/2023-24] [EDCH-161/2023-24][2024_DVVNL_901189_3] Dakshinanchal Vidyut Vitran Nigam Ltd.
218 06-Apr-2024 09:00 AM 14-May-2024 12:00 PM 14-May-2024 02:00 PM [EDCH-160/2023-24] [EDCH-160/2023-24][2024_DVVNL_901174_3] Dakshinanchal Vidyut Vitran Nigam Ltd.
219 05-Apr-2024 05:20 PM 14-May-2024 04:00 PM 15-May-2024 03:00 PM [206/ECC(D)Ag/2023-24] [206/ECC(D)Ag/2023-24][2024_DVVNL_921551_1] Dakshinanchal Vidyut Vitran Nigam Ltd.
220 05-Apr-2024 05:10 PM 14-May-2024 04:00 PM 15-May-2024 03:00 PM [205/ECC(D)Ag/2023-24] [205/ECC(D)Ag/2023-24][2024_DVVNL_921545_1] Dakshinanchal Vidyut Vitran Nigam Ltd.
221 05-Apr-2024 05:00 PM 14-May-2024 04:00 PM 15-May-2024 03:00 PM [204/ECC(D)Ag/2023-24] [204/ECC(D)Ag/2023-24][2024_DVVNL_921540_1] Dakshinanchal Vidyut Vitran Nigam Ltd.
222 05-Apr-2024 05:00 PM 14-May-2024 04:00 PM 15-May-2024 03:00 PM [203/ECC(D)Ag/2023-24] [203/ECC(D)Ag/2023-24][2024_DVVNL_921537_1] Dakshinanchal Vidyut Vitran Nigam Ltd.
223 05-Apr-2024 04:40 PM 14-May-2024 01:00 PM 15-May-2024 01:00 PM [T-78/2023-24 ] [T-78/2023-24][2023_DVVNL_869684_4] Dakshinanchal Vidyut Vitran Nigam Ltd.
224 05-Apr-2024 02:50 PM 14-May-2024 04:00 PM 15-May-2024 03:00 PM [201/ECC(D)Ag/2023-24] [201/ECC(D)Ag/2023-24][2024_DVVNL_921515_1] Dakshinanchal Vidyut Vitran Nigam Ltd.
225 05-Apr-2024 02:10 PM 14-May-2024 04:00 PM 15-May-2024 03:00 PM [200/ECC(D)Ag/2023-24] [200/ECC(D)Ag/2023-24][2024_DVVNL_921514_1] Dakshinanchal Vidyut Vitran Nigam Ltd.
226 05-Apr-2024 02:00 PM 14-May-2024 04:00 PM 15-May-2024 03:00 PM [194/ECC(D)Ag/2023-24] [194/ECC(D)Ag/2023-24][2024_DVVNL_921496_1] Dakshinanchal Vidyut Vitran Nigam Ltd.
227 05-Apr-2024 09:00 AM 14-May-2024 01:00 PM 15-May-2024 01:00 PM [T-127/2023-24] [T-127/2023-24][2024_DVVNL_921443_1] Dakshinanchal Vidyut Vitran Nigam Ltd.
228 05-Apr-2024 09:00 AM 14-May-2024 01:00 PM 15-May-2024 01:00 PM [T-128/2023-24] [T-128/2023-24][2024_DVVNL_921444_1] Dakshinanchal Vidyut Vitran Nigam Ltd.
229 05-Apr-2024 09:00 AM 14-May-2024 01:00 PM 15-May-2024 01:00 PM [T-133/2023-24] [T-133/2023-24][2024_DVVNL_921449_1] Dakshinanchal Vidyut Vitran Nigam Ltd.
230 05-Apr-2024 09:00 AM 14-May-2024 01:00 PM 15-May-2024 01:00 PM [T-125/2023-24] [T-125/2023-24][2024_DVVNL_921441_1] Dakshinanchal Vidyut Vitran Nigam Ltd.
231 05-Apr-2024 09:00 AM 14-May-2024 01:00 PM 15-May-2024 01:00 PM [T-130/2023-24] [T-130/2023-24][2024_DVVNL_921446_1] Dakshinanchal Vidyut Vitran Nigam Ltd.
232 04-Apr-2024 09:00 AM 15-May-2024 01:00 PM 15-May-2024 05:00 PM [Full Deposit related Mixed works under EDD, Banda (Rural)] [EDCBNDA-89/2023-24][2024_DVVNL_912023_2] Dakshinanchal Vidyut Vitran Nigam Ltd.
233 04-Apr-2024 09:00 AM 15-May-2024 01:00 PM 15-May-2024 05:00 PM [Heavy Storm related works under EDD, Banda] [EDCBNDA-87/2023-24][2024_DVVNL_902959_3] Dakshinanchal Vidyut Vitran Nigam Ltd.
234 03-Apr-2024 02:30 PM 14-May-2024 04:00 PM 15-May-2024 03:00 PM [181/ECC(D)Ag/2023-24] [181/ECC(D)Ag/2023-24][2024_DVVNL_921193_1] Dakshinanchal Vidyut Vitran Nigam Ltd.
235 03-Apr-2024 02:25 PM 14-May-2024 04:00 PM 15-May-2024 03:00 PM [180/ECC(D)Ag/2023-24] [180/ECC(D)Ag/2023-24][2024_DVVNL_921191_1] Dakshinanchal Vidyut Vitran Nigam Ltd.
236 03-Apr-2024 02:00 PM 14-May-2024 04:00 PM 15-May-2024 03:00 PM [174/ECC(D)Ag/2023-24] [174/ECC(D)Ag/2023-24][2024_DVVNL_921185_1] Dakshinanchal Vidyut Vitran Nigam Ltd.
237 03-Apr-2024 10:00 AM 17-May-2024 04:00 PM 18-May-2024 03:00 PM [149/ECC(D)Ag/2023-24] [149/ECC(D)Ag/2023-24][2024_DVVNL_921079_1] Dakshinanchal Vidyut Vitran Nigam Ltd.
238 03-Apr-2024 10:00 AM 17-May-2024 04:00 PM 18-May-2024 03:00 PM [142/ECC(D)Ag/2023-24] [142/ECC(D)Ag/2023-24][2024_DVVNL_921054_1] Dakshinanchal Vidyut Vitran Nigam Ltd.
239 02-Apr-2024 10:00 AM 14-May-2024 04:00 PM 15-May-2024 03:00 PM [176/ECC(D)Ag/2023-24] [176/ECC(D)Ag/2023-24][2024_DVVNL_920942_1] Dakshinanchal Vidyut Vitran Nigam Ltd.
240 02-Apr-2024 10:00 AM 14-May-2024 04:00 PM 15-May-2024 03:00 PM [178/ECC(D)Ag/2023-24 ] [178/ECC(D)Ag/2023-24][2024_DVVNL_920954_1] Dakshinanchal Vidyut Vitran Nigam Ltd.
241 02-Apr-2024 10:00 AM 14-May-2024 04:00 PM 15-May-2024 03:00 PM [185/ECC(D)Ag/2023-24] [185/ECC(D)Ag/2023-24][2024_DVVNL_920997_1] Dakshinanchal Vidyut Vitran Nigam Ltd.
242 02-Apr-2024 10:00 AM 14-May-2024 04:00 PM 15-May-2024 03:00 PM [177/ECC(D)Ag/2023-24] [177/ECC(D)Ag/2023-24][2024_DVVNL_920952_1] Dakshinanchal Vidyut Vitran Nigam Ltd.
243 02-Apr-2024 10:00 AM 14-May-2024 04:00 PM 15-May-2024 03:00 PM [179/ECC(D)Ag/2023-24] [179/ECC(D)Ag/2023-24][2024_DVVNL_920956_1] Dakshinanchal Vidyut Vitran Nigam Ltd.
244 01-Apr-2024 02:00 PM 22-May-2024 12:00 PM 22-May-2024 06:00 PM [109/EDC(KNJ)/2023-24] [109/EDC(KNJ)/2023-24][2024_DVVNL_920926_1] Dakshinanchal Vidyut Vitran Nigam Ltd.
245 01-Apr-2024 02:00 PM 22-May-2024 12:00 PM 22-May-2024 06:00 PM [108/EDC(KNJ)/2023-24] [108/EDC(KNJ)/2023-24][2024_DVVNL_920924_1] Dakshinanchal Vidyut Vitran Nigam Ltd.
246 01-Apr-2024 10:00 AM 14-May-2024 04:00 PM 15-May-2024 03:00 PM [168/ECC(D)Ag/2023-24 ] [168/ECC(D)Ag/2023-24][2024_DVVNL_920919_1] Dakshinanchal Vidyut Vitran Nigam Ltd.
247 31-Mar-2024 04:30 PM 14-May-2024 12:00 PM 14-May-2024 04:00 PM [Construction of 33 kv line] [10/EWC/JHS/2023-24][2024_DVVNL_918993_1] Dakshinanchal Vidyut Vitran Nigam Ltd.
248 30-Mar-2024 01:00 PM 13-May-2024 03:00 PM 13-May-2024 05:00 PM [For deep boring earthing of power transformers in 33/11 KV substations.Work Under EDC Mahoba in Business Plan 2024-25] [93/SE/EDCM/2023-24][2024_DVVNL_920786_1] Dakshinanchal Vidyut Vitran Nigam Ltd.
249 28-Mar-2024 09:00 AM 15-May-2024 01:00 PM 15-May-2024 05:00 PM [Replacement and installation of 3 Phase Meter on above of 5 KW domestic/commercial and Prodigy Type Meters on above of 25 KVA STW/Other Govt. connections under ETD, Banda, Chitrakoot, Hamirpur and Mahoba] [EDCBNDA-78/2023-24][2024_DVVNL_900660_2] Dakshinanchal Vidyut Vitran Nigam Ltd.
250 21-Mar-2024 05:00 PM 14-May-2024 01:00 PM 15-May-2024 01:00 PM [T-79/2023-24] [T-79/2023-24][2023_DVVNL_869697_5] Dakshinanchal Vidyut Vitran Nigam Ltd.
251 20-Mar-2024 03:00 PM 17-May-2024 01:00 PM 17-May-2024 04:00 PM [SUPPLY OF 36 KV 1250A, Outdoor Type Vaccum Circuit Breaker] [DVVNL-MM/3506-2024][2024_DVVNL_916137_1] Dakshinanchal Vidyut Vitran Nigam Ltd.
252 18-Mar-2024 09:00 AM 15-May-2024 01:00 PM 15-May-2024 05:00 PM [Electrification work of payjal yojana and others under EDD, Banda (Rural)] [EDCBNDA-92/2023-24][2024_DVVNL_912029_1] Dakshinanchal Vidyut Vitran Nigam Ltd.
253 18-Mar-2024 09:00 AM 15-May-2024 01:00 PM 15-May-2024 05:00 PM [M and R related works under EDD, Banda (Rural)] [EDCBNDA-88/2023-24][2024_DVVNL_912018_1] Dakshinanchal Vidyut Vitran Nigam Ltd.
254 15-Mar-2024 06:55 PM 14-May-2024 03:00 PM 15-May-2024 04:00 PM [Electrification of Household in PE UE habitations at DVVNL Agra] [DVVNL/RDSS/Additional HH/2024/5][2024_DVVNL_917843_1] Dakshinanchal Vidyut Vitran Nigam Ltd.
255 15-Mar-2024 06:55 PM 14-May-2024 03:00 PM 15-May-2024 04:00 PM [Electrification of Household in PE UE habitations at DVVNL Agra] [DVVNL/RDSS/Additional HH/2024/6][2024_DVVNL_917914_1] Dakshinanchal Vidyut Vitran Nigam Ltd.
256 06-Mar-2024 05:30 PM 14-May-2024 03:30 PM 15-May-2024 01:00 PM [66/EDC(O)/W/2023-24 ] [66/EDC(O)/W/2023-24][2024_DVVNL_902782_2] Dakshinanchal Vidyut Vitran Nigam Ltd.
257 02-Mar-2024 05:00 PM 13-May-2024 12:00 PM 13-May-2024 03:00 PM [PROVIDING 24X7 MAINTENANCE GANG ALONG WITH VEHICLE (GPS LOCATIONAL TOOL) IN EUDD III, MATHURA UNDER THE JURISDICTION OF SUPERINTENDING ENGINEER, ELECTRICITY URBAN DISTRIBUTION CIRCLE, MATHURA] [56/EUDC(M)/2023-24][2023_DVVNL_869376_3] Dakshinanchal Vidyut Vitran Nigam Ltd.
258 01-Mar-2024 06:55 PM 14-May-2024 06:00 PM 15-May-2024 03:00 PM [248/EDCK/2023-24] [248/EDCK/2023-24][2024_DVVNL_909311_1] Dakshinanchal Vidyut Vitran Nigam Ltd.
259 01-Mar-2024 05:00 PM 14-May-2024 03:30 PM 15-May-2024 01:00 PM [67/EDC(O)/W/2023-24] [67/EDC(O)/W/2023-24][2024_DVVNL_909200_1] Dakshinanchal Vidyut Vitran Nigam Ltd.
260 22-Feb-2024 05:30 PM 13-May-2024 12:00 PM 13-May-2024 04:30 PM [33 KV Eka Line in District Firozabad] [EWCA/T-07 (2023-24)][2024_DVVNL_902910_1] Dakshinanchal Vidyut Vitran Nigam Ltd.
261 22-Feb-2024 03:00 PM 14-May-2024 03:30 PM 15-May-2024 01:00 PM [65/EDC(O)/W/2023-24] [65/EDC(O)/W/2023-24][2024_DVVNL_902768_1] Dakshinanchal Vidyut Vitran Nigam Ltd.
262 22-Feb-2024 02:00 PM 14-May-2024 03:30 PM 15-May-2024 01:00 PM [64/EDC(O)/W/2023-24] [64/EDC(O)/W/2023-24][2024_DVVNL_902750_1] Dakshinanchal Vidyut Vitran Nigam Ltd.
263 19-Feb-2024 02:10 PM 14-May-2024 01:00 PM 15-May-2024 01:00 PM [T-83/2023-24] [T-83/2023-24][2024_DVVNL_900196_1] Dakshinanchal Vidyut Vitran Nigam Ltd.
264 13-Feb-2024 12:00 PM 13-May-2024 01:00 PM 13-May-2024 06:00 PM [Erection of 11 KV Lines for bifercation of feeders at 33/11 KV Sub-Station, Samagra/Marka under EDD, Banda] [EDCBNDA-64/2023-24][2024_DVVNL_883799_3] Dakshinanchal Vidyut Vitran Nigam Ltd.
265 13-Feb-2024 12:00 PM 13-May-2024 01:00 PM 13-May-2024 06:00 PM [Erection of 11 KV Lines for load sharing/load transfer due to overloading of 11 KV various feeders and from vill. Poon to 33/11 KV SS Pakharauli under EDD, Banda] [EDCBNDA-65/2023-24][2024_DVVNL_883800_3] Dakshinanchal Vidyut Vitran Nigam Ltd.
266 13-Feb-2024 12:00 PM 15-May-2024 01:00 PM 15-May-2024 05:00 PM [The electrification work of Harizan Basti (Vill. Majhiva) under EDD, Banda (Rural)] [EDCBNDA-67/2023-24][2024_DVVNL_883804_3] Dakshinanchal Vidyut Vitran Nigam Ltd.
267 13-Feb-2024 12:00 PM 13-May-2024 01:00 PM 13-May-2024 06:00 PM [Erection of 11 KV Lines from Vill. Berranv to 33/11 KV S/S, Pakharauli under EDD, Banda] [EDCBNDA-63/2023-24][2024_DVVNL_883795_3] Dakshinanchal Vidyut Vitran Nigam Ltd.
268 08-Feb-2024 09:00 AM 13-May-2024 12:00 PM 13-May-2024 04:30 PM [33 KV Nagla Choora Line ] [EWCA/T-12 (2023-24)][2024_DVVNL_892300_1] Dakshinanchal Vidyut Vitran Nigam Ltd.
269 30-Jan-2024 05:00 PM 21-May-2024 12:00 PM 21-May-2024 06:00 PM [90/2023-2024] [90/EDC(KNJ)/2023-24][2024_DVVNL_887611_1] Dakshinanchal Vidyut Vitran Nigam Ltd.
270 30-Jan-2024 05:00 PM 21-May-2024 12:00 PM 21-May-2024 06:00 PM [89/2023-2024] [89/EDC(KNJ)/2023-24][2024_DVVNL_887584_1] Dakshinanchal Vidyut Vitran Nigam Ltd.
271 30-Jan-2024 05:00 PM 21-May-2024 12:00 PM 21-May-2024 06:00 PM [91/2023-2024] [91/EDC(KNJ)/2023-24][2024_DVVNL_887632_1] Dakshinanchal Vidyut Vitran Nigam Ltd.
272 30-Jan-2024 05:00 PM 21-May-2024 12:00 PM 21-May-2024 06:00 PM [92/2023-2024] [92/EDC(KNJ)/2023-24][2024_DVVNL_887649_1] Dakshinanchal Vidyut Vitran Nigam Ltd.
273 27-Jan-2024 09:00 AM 15-May-2024 12:00 PM 15-May-2024 03:00 PM [EDCA-67/2023-24] [EDCA-67/2023-24][2024_DVVNL_885978_1] Dakshinanchal Vidyut Vitran Nigam Ltd.
274 27-Jan-2024 09:00 AM 15-May-2024 12:00 PM 15-May-2024 03:00 PM [EDCA-68/2023-24] [EDCA-68/2023-24][2024_DVVNL_885980_1] Dakshinanchal Vidyut Vitran Nigam Ltd.
275 27-Jan-2024 09:00 AM 15-May-2024 12:00 PM 15-May-2024 03:00 PM [EDCA-69/2023-24] [EDCA-69/2023-24][2024_DVVNL_885984_1] Dakshinanchal Vidyut Vitran Nigam Ltd.
276 12-Jan-2024 09:00 AM 21-May-2024 12:00 PM 21-May-2024 06:00 PM [82/2023-24] [82/EDC(KNJ)/2023-24][2024_DVVNL_880142_1] Dakshinanchal Vidyut Vitran Nigam Ltd.
 