1. |
22-Feb-2024 06:30 PM |
28-Mar-2024 04:00 PM |
30-Mar-2024 04:00 PM |
[Supply Of Vulcanized endless rubber belt for raw coal feeder, 2x500MW, BTPS and DTPS, Anpara]
[T-75/CF-259/PD-I/ABTPS/ ANP/2023-24][2024_RVUNL_903039_1]
|
UP Rajya Vidyut Utpadan Nigam Ltd||Anpara Thermal Power Project- UPRVUNL- Sonebhadra
|
2. |
21-Mar-2024 09:00 AM |
28-Mar-2024 04:00 PM |
30-Mar-2024 02:00 PM |
[Supply of 11 KV HT TVM Cat-A Meter, 11 KV HT TVM Cat-B Meter, 11 KV HT TVM Cat-C Meter, 33 KV HT TVM Cat-A Meter, 33 KV HT TVM Cat-B Meter and 33 KV HT TVM Cat-C Meter]
[MEDCO/2887/2024][2024_MVVNL_912341_3]
|
Madhyanchal Vidyut Vitran Nigam Ltd||C E (MM)
|
3. |
15-Mar-2024 11:00 AM |
28-Mar-2024 04:00 PM |
28-Mar-2024 05:30 PM |
[Laying of water line newer labur satte in sikrol ward]
[1364/EE(N)/JKNN/23-24 Dated- 12-10-2023][2023_NNVAR_851232_40]
|
Varanasi Nagar Nigam Varanasi
|
4. |
14-Mar-2024 03:30 PM |
28-Mar-2024 04:00 PM |
28-Mar-2024 04:30 PM |
[Jais Nagar Palika Parishad Water Supply Reorganization Scheme]
[571/W-60/06][2024_UPJNM_917050_1]
|
U P Jal Nigam (HQ), Lucknow||Chief Engineer (Faizabad)||SE, CC, Faizabad||EE Construction Division Faizabad
|
5. |
15-Mar-2024 03:00 PM |
28-Mar-2024 04:00 PM |
30-Mar-2024 12:30 PM |
[Work]
[T.No. 65/ETCS/2023-24][2024_UPTCL_917606_1]
|
UP Power Transmission Corp.Ltd (Operation)||Chief Engineer (TC) Lucknow||SE ETC Sultanpur||Accountant 400kv Substation Division Sultanpur
|
6. |
15-Mar-2024 03:00 PM |
28-Mar-2024 04:00 PM |
30-Mar-2024 12:00 PM |
[Work]
[T.No. 64/ETCS/2023-24][2024_UPTCL_917574_1]
|
UP Power Transmission Corp.Ltd (Operation)||Chief Engineer (TC) Lucknow||SE ETC Sultanpur||Accountant 400kv Substation Division Sultanpur
|
7. |
22-Mar-2024 11:30 AM |
28-Mar-2024 04:00 PM |
30-Mar-2024 03:00 PM |
[Spot maintenance work of 5 MVA Power Transformer at 33/11 KV Substation Bansi Gramin in O and M head 2023-24]
[120/EDC(S)/2023-24][2024_PVVNV_915584_2]
|
Purvanchal Vidyut Vitran Nigam Limited Varanasi
|
8. |
28-Feb-2024 06:00 PM |
28-Mar-2024 04:00 PM |
29-Mar-2024 02:00 PM |
[DIESEL VEHICLE FOR EE, EUDD-IV GKP]
[48EUDC(G)/2023-24][2024_PVVNV_907349_1]
|
Purvanchal Vidyut Vitran Nigam Limited Varanasi||Chief Engineer (D) PuVVNL Gorakhpur
|
9. |
18-Mar-2024 11:00 AM |
28-Mar-2024 04:00 PM |
29-Mar-2024 11:00 AM |
[NAGAR PALIKA PARISHAD SIDDHARTH NAGAR KE WARD NO-25 KRISHNA NAGAR ME 20HP PUMPHOUSE KE ADHISTHAPAN KA KARYA AVM PIPE LINE VISTAR KA KARYA]
[1567/nppsdr/2023-24][2024_DOLBU_918652_2]
|
Directorate of Local Bodies UP||Nagar Palika Parishad Siddharthnagar Siddharthnagar
|
10. |
19-Mar-2024 02:00 PM |
28-Mar-2024 04:00 PM |
30-Mar-2024 04:00 PM |
[N-PAR/B/MMC1/PD01/6000004807]
[N-PAR/B/MMC1/PD01/6000004807][2024_RVUNL_919250_1]
|
UP Rajya Vidyut Utpadan Nigam Ltd||Parichha Thermal Power Project- UPRVUNL- Jhansi
|