1. |
27-Mar-2024 09:00 AM |
25-Apr-2024 01:00 PM |
25-Apr-2024 04:00 PM |
[For Supply of A-4 Size Paper Rim for the Office Use of Executive Engineer, Under EUDD-IV, Meerut.]
[E-Tender No.-294/EUDC/MEERUT/2023-2024][2024_PVVNL_919439_2]
|
Paschimanchal Vidyut Vitran Nigam Ltd.
|
2. |
27-Mar-2024 09:00 AM |
25-Apr-2024 01:00 PM |
25-Apr-2024 04:00 PM |
[For Supply of A-4 Size Paper Rim for the Office Use of Chief Engineer, Under Chief Engineer (D), Meerut Zone, Meerut.]
[E-Tender No.-297/EUDC/MEERUT/2023-2024][2024_PVVNL_919451_2]
|
Paschimanchal Vidyut Vitran Nigam Ltd.
|
3. |
27-Mar-2024 09:00 AM |
25-Apr-2024 01:00 PM |
25-Apr-2024 04:00 PM |
[For the Work of Business Plane Scheme 2024-25 of Providing and Installing LT Protection Unite on Turnkey Basis of Distribution Transformers Situated at Different Sites Under EUDD-II, Meerut.]
[E-Tender No.-277/EUDC/MEERUT/2023-2024][2024_PVVNL_919277_2]
|
Paschimanchal Vidyut Vitran Nigam Ltd.
|
4. |
04-Apr-2024 06:00 PM |
25-Apr-2024 01:00 PM |
26-Apr-2024 01:00 PM |
[Dismantling, Cutting and Repairing of Old Worn Out/Eroded pipeline and Erection Of ECO ASH PAN pipeline]
[NPAR/C/OMC2/BMD1/6000004282][2024_RVUNL_884826_2]
|
UP Rajya Vidyut Utpadan Nigam Ltd||Parichha Thermal Power Project- UPRVUNL- Jhansi
|
5. |
23-Jan-2024 06:00 PM |
25-Apr-2024 01:00 PM |
25-Apr-2024 03:00 PM |
[For engagement of 01 no. diesel Vehicle along with driver for use of AE (IT), under Chief Engineer(D) , Varanasi Zone-I, Varanasi and For engagement of 01 no. diesel Vehicle along with driver for use of AE (IT), under Superintending Engineer, UEDC-I,]
[120/UEDC-I(V)/2023-24 ][2024_PVVNV_884238_1]
|
Purvanchal Vidyut Vitran Nigam Limited Varanasi
|
6. |
17-Feb-2024 06:00 PM |
25-Apr-2024 01:00 PM |
25-Apr-2024 03:00 PM |
[For Attending 33 KV, 11KV and LT underground cable/Outdoor/indoor in area of UEDD-II, Varaansi Under O AND M.]
[126/UEDC-I(V)/2023-24 ][2024_PVVNV_899255_1]
|
Purvanchal Vidyut Vitran Nigam Limited Varanasi
|
7. |
17-Apr-2024 09:00 AM |
25-Apr-2024 01:00 PM |
25-Apr-2024 04:00 PM |
[For the Work of Business Plan 2024-25 for Load Bifurcation, Additional Installation Transformer and Replacement Damaged VCB Works Under EUDD-II, Meerut.]
[E-Tender No.-303/EUDC/MEERUT/2023-2024][2024_PVVNL_922370_1]
|
Paschimanchal Vidyut Vitran Nigam Ltd.
|
8. |
27-Mar-2024 09:00 AM |
25-Apr-2024 01:00 PM |
25-Apr-2024 04:00 PM |
[For the Work of Business Plane Scheme 2024-25 of Installing Earthing of Power Transformer of 33/11 KV Sub-Station and Distribution Transformers/VCB of 11/0.4 KV Sub-Station at Different Sites Under EUDD-II, Meerut.]
[E-Tender No.-278/EUDC/MEERUT/2023-2024][2024_PVVNL_919311_2]
|
Paschimanchal Vidyut Vitran Nigam Ltd.
|
9. |
05-Apr-2024 12:50 PM |
25-Apr-2024 01:00 PM |
25-Apr-2024 04:00 PM |
[For the Work of Carried Out at 33/11 KV Sub-Station Begumpul, Sadar, RTO and Khadauli in the area EUDSD-III, Under EUDD-II, Meerut.]
[E-Tender No.-268/EUDC/MEERUT/2023-2024][2024_PVVNL_917186_2]
|
Paschimanchal Vidyut Vitran Nigam Ltd.
|
10. |
17-Apr-2024 09:00 AM |
25-Apr-2024 01:00 PM |
25-Apr-2024 03:00 PM |
[Work for Electrification of Schools (Polling Booths) under EDD-KHAGA Fatehpur]
[06/EDCF/WORK/2024-25][2024_PVVNV_922352_1]
|
Purvanchal Vidyut Vitran Nigam Limited Varanasi||Chief Engineer (D) PuVVNL Allahabad||SE Electricity Distribution Circle Fatehpur
|