1. |
12-May-2022 09:00 AM |
19-May-2022 10:30 AM |
19-May-2022 11:00 AM |
[Construction of Kasturba Gandhi Vidhyalaya, Academic Block at Pilkhuwa, Distt Ghaziabad]
[0246/EE/GZB/E-TENDER/2022-23][2022_SCIDC_691314_3]
|
U.P. State Construction and Infrastructure Development Corporation Ltd.||Unit Ghaziabad
|
2. |
12-May-2022 06:00 PM |
19-May-2022 11:00 AM |
20-May-2022 02:30 PM |
[SUPPLY OF WHEAT STRAW ]
[215][2022_UPAHD_699039_1]
|
Animal Husbandry Directorate
|
3. |
18-Apr-2022 11:50 AM |
19-May-2022 11:00 AM |
19-May-2022 02:00 PM |
[Work]
[ET-03/ETC-I(K)/2022-23 ][2022_UPTCL_690061_1]
|
UP Power Transmission Corp.Ltd (Operation)||Chief Engineer (TS) South Agra||S.E. ETC-I Kanpur
|
4. |
14-May-2022 09:00 AM |
19-May-2022 11:00 AM |
19-May-2022 11:30 AM |
[Construction work of CC Road at Gram Mudiladih Me Jais Ke Ghar Se Suvaiba Ke Ghar Tak 150 Mtr Block Badhani Distt Siddharthnagar]
[213/EEBasti/P Nidhi Siddharth Nagar/ Dt 13-05-2022][2022_SCIDC_699456_1]
|
U.P. State Construction and Infrastructure Development Corporation Ltd.||Unit Sant Kabir Nagar
|
5. |
14-May-2022 09:00 AM |
19-May-2022 11:00 AM |
19-May-2022 11:30 AM |
[Construction work of Toilet, Brick Coba, Treatment, Interlocking, Boundarywall, Gate and Flooring at Sahayak Sambhagiya Pariwan Office District Siddharth Nagar]
[79/EE Basti/E Tender /2022-23 Dt 21-04-2022][2022_SCIDC_691435_2]
|
U.P. State Construction and Infrastructure Development Corporation Ltd.||Unit Sant Kabir Nagar
|
6. |
18-Apr-2022 12:30 PM |
19-May-2022 11:00 AM |
19-May-2022 02:00 PM |
[work]
[ ET-001/ETC-I(K)/2022-23 ][2022_UPTCL_690086_1]
|
UP Power Transmission Corp.Ltd (Operation)||Chief Engineer (TS) South Agra||S.E. ETC-I Kanpur
|
7. |
14-May-2022 09:00 AM |
19-May-2022 11:00 AM |
19-May-2022 11:30 AM |
[Construction work of CC Road at Gram Sitarampur Tola Vishunpurwa Me Ghanshyam Pandit Ke Khet Se Primary School Tak 200 Mtr Block shohratgarh Distt Siddharthnagar]
[214/EEBasti/P Nidhi Siddharth Nagar/ Dt 13-05-2022][2022_SCIDC_699471_1]
|
U.P. State Construction and Infrastructure Development Corporation Ltd.||Unit Sant Kabir Nagar
|
8. |
28-Apr-2022 09:00 AM |
19-May-2022 11:00 AM |
19-May-2022 12:30 PM |
[JOB WORK]
[957/MBD/SM/JOBWORK/MBD_PTL/22][2022_UPSRT_693929_1]
|
U.P. State Road Transport Corporation||Chief General Manager(Technical)
|
9. |
10-May-2022 12:00 PM |
19-May-2022 11:00 AM |
19-May-2022 01:00 PM |
[FOR PRELIMINARY SURVEY OF PROPOSED 400 KV D/C MAHEBA (JALAUN)-FARRUKHABAD D/C LINE UNDE ETD-FATEHGARH.]
[ E-Tender No.04/ETC-II(K)/2022-23 ][2022_UPTCL_694778_2]
|
UP Power Transmission Corp.Ltd (Operation)||Chief Engineer (TSC) South Central Jhansi||SE ETC-II, Kanpur
|
10. |
14-May-2022 09:00 AM |
19-May-2022 11:00 AM |
20-May-2022 12:00 PM |
[Re-Construction Fall Work Purwa Branch KM. 37.000]
[01/EE/2022-23][2022_UPIDC_693053_7]
|
U P Irrigation Department (Civil)||Chief Engineer-Sharda, Lucknow||VI Circle Irrigation Works, Lucknow||UDSC, unnao
|