1. |
03-Apr-2024 06:55 PM |
19-Apr-2024 09:00 AM |
19-Apr-2024 11:00 AM |
[COMPETITIVE e-bidding FOR- E-tenders are invited for outsourcing of Technical staff and skilled, unskilled workers for operation of Four co-operative distilleries as per CPCB norms including repair and maintenance of all equipments/machinery during f]
[8630 /U.P.F./GM(AT)/Proj.Fin/36A][2024_UPSFF_921188_1]
|
UP Cooperative Sugar Factories Federation Ltd
|
2. |
10-Apr-2024 04:00 PM |
19-Apr-2024 10:00 AM |
20-Apr-2024 11:00 AM |
[Work]
[T-05/ETDB/2024-25][2024_UPTCL_921996_1]
|
UP Power Transmission Corp.Ltd (Operation)||Chief Engineer (TS) South Agra||SE ETC Banda||EE ETD Banda
|
3. |
10-Apr-2024 04:00 PM |
19-Apr-2024 10:00 AM |
20-Apr-2024 10:30 AM |
[Work]
[T-04/ETDB/2024-25][2024_UPTCL_921994_1]
|
UP Power Transmission Corp.Ltd (Operation)||Chief Engineer (TS) South Agra||SE ETC Banda||EE ETD Banda
|
4. |
08-Apr-2024 10:00 AM |
19-Apr-2024 11:00 AM |
19-Apr-2024 11:00 AM |
[Ramala Chini Mill Operation and Maintenance Through out Sourcing]
[49/e-tender/Mill Op./2024-25 Dated 06.04.2024][2024_RSCML_921719_1]
|
Ramala Sahkari Chini Mills Ltd. Ramala (Baghpat)
|
5. |
13-Mar-2024 05:00 PM |
19-Apr-2024 11:00 AM |
19-Apr-2024 03:00 PM |
[PROVIDING 01 NO 5.0 KVA GENERATOR SET WITH OPERATOR UNDER EXECUTIVE ENGINEER ETD III BULANDSHAHR.]
[101/EDC-III/B/2023-2024][2024_PVVNL_916446_1]
|
Paschimanchal Vidyut Vitran Nigam Ltd.
|
6. |
03-Apr-2024 06:00 PM |
19-Apr-2024 11:00 AM |
20-Apr-2024 03:00 PM |
[e]
[T-01/ETD/MUN/2024-25][2024_UPTCL_921238_1]
|
UP Power Transmission Corp.Ltd (Operation)||Chief Engineer (TW) West Meerut||SE ETC Ghaziabad||EE ETD MURADNAGAR
|
7. |
28-Mar-2024 04:30 PM |
19-Apr-2024 11:00 AM |
19-Apr-2024 03:00 PM |
[Work]
[ET-06/ETD-I (K)/2023-24][2024_UPTCL_920616_1]
|
UP Power Transmission Corp.Ltd (Operation)||Chief Engineer (TS) South Agra||S.E. ETC-I Kanpur||EE ETD - I Kanpur
|
8. |
03-Apr-2024 12:00 PM |
19-Apr-2024 12:00 PM |
19-Apr-2024 03:00 PM |
[Providing the following Diesel Driven Car, Jeep on rent along with Driver to the various offices under the jurisdiction of Superintending Engineer, Electricity Urban Distribution Circle, Mathura]
[69/EUDC(M)/2023-24][2024_DVVNL_909931_2]
|
Dakshinanchal Vidyut Vitran Nigam Ltd.
|
9. |
01-Apr-2024 10:00 AM |
19-Apr-2024 12:00 PM |
19-Apr-2024 03:00 PM |
[EXECUTION OF WORK FOR PROTECTION OF L.T. EQUIPMENT SUCH AS 100 KVA AND ABOVE DISTRIBUTION TRANSFORMER (ON SEMI TURNKEY BASIS) IN THE AREA OF ELECTRICITY DISTRIBUTION DIVISION-II, GORAKHPUR AGAINST ADDITIONAL BUSINESS PLAN SCHEME 2024-25]
[93/EDC-II(G)/2023-24][2024_PVVNV_920912_1]
|
Purvanchal Vidyut Vitran Nigam Limited Varanasi||Chief Engineer (D) PuVVNL Gorakhpur
|
10. |
30-Mar-2024 04:00 PM |
19-Apr-2024 12:00 PM |
20-Apr-2024 12:30 PM |
[Under District Lucknow, Work of Deep Rebor, CWR (Rising Main, Over Head Tank, Pump House and Distribution System) at Lokbandhu Rajnarayan Joint Hospital, Lucknow, Lot No 1]
[8354/SE RED LUCKNOW/Lucknow/23-24 Dt 7-3-24][2024_REDUP_920823_1]
|
Director Cum Chief Engineer RED||CHIEF ENGINEER EAST||SE LUCKNOW CIRCLE
|