1. |
10-May-2022 03:00 PM |
25-May-2022 01:00 PM |
27-May-2022 02:00 PM |
[The Neutral Arthing of Power]
[19/EDC(BH)/2022-23][2022_PVVNV_697736_1]
|
Purvanchal Vidyut Vitran Nigam Limited Varanasi
|
2. |
28-Apr-2022 04:00 PM |
25-May-2022 01:00 PM |
25-May-2022 03:00 PM |
[Maintenace of HT/LT Line]
[100/EDC-I(M)/2021-22][2022_DVVNL_694376_1]
|
Dakshinanchal Vidyut Vitran Nigam Ltd.
|
3. |
28-Apr-2022 03:00 PM |
25-May-2022 01:00 PM |
25-May-2022 03:00 PM |
[Maintenace of HT/LT Line]
[98/EDC-I(M)/2021-22][2022_DVVNL_694299_1]
|
Dakshinanchal Vidyut Vitran Nigam Ltd.
|
4. |
18-May-2022 06:30 PM |
25-May-2022 01:00 PM |
26-May-2022 04:00 PM |
[DVVNL-MM/3200-2022]
[DVVNL-MM/3200-2022-11/0.433KV, 100 KVA TF.with ICB][2022_DVVNL_700582_1]
|
Dakshinanchal Vidyut Vitran Nigam Ltd.
|
5. |
07-May-2022 04:00 PM |
25-May-2022 01:00 PM |
25-May-2022 03:00 PM |
[Work ]
[T-04/E_400KV_Agra_South/22-23][2022_UPTCL_697128_1]
|
UP Power Transmission Corp.Ltd (Operation)||Chief Engineer (TS) South Agra||SE, ETC, Mathura||E.E., 400 KV S/S Agra South, Agra
|
6. |
18-May-2022 05:00 PM |
25-May-2022 01:00 PM |
25-May-2022 03:00 PM |
[For The work of Full Deposit Scheme to be passed from time to time under EDD-2 Agra]
[05/EDCA/2022-23][2022_DVVNL_700461_1]
|
Dakshinanchal Vidyut Vitran Nigam Ltd.
|
7. |
18-May-2022 04:00 PM |
25-May-2022 01:00 PM |
26-May-2022 03:00 PM |
[Supply of Material ]
[41/EDC(M)/22-23][2022_PVVNV_700459_1]
|
Purvanchal Vidyut Vitran Nigam Limited Varanasi
|
8. |
09-May-2022 09:00 AM |
25-May-2022 01:00 PM |
25-May-2022 04:00 PM |
[For Replacement of damaged LT AB Conductor at different sites (20 Foota Santar Ghante wali gali tak, Dilshad Shokat wali gali and from Biscuit wali factory to Divine wali Gali) under 33/11 KV S/S Vikaspuri in the Area of EUDSD-VI, under EUDD-III, MRT]
[E-Tender No.-15/EUDC/MEERUT/2022-2023][2022_PVVNL_687207_2]
|
Paschimanchal Vidyut Vitran Nigam Ltd.
|
9. |
09-May-2022 09:00 AM |
25-May-2022 01:00 PM |
25-May-2022 04:00 PM |
[For Replacement of damaged LT AB Conductor at different sites (from 400 KVA T/F Hans Chopla, 400 KVA T/F Valmiki Basti Wala towards Gali No. 03 Gandhinagar under the Area of 33/11 KV S/S Nauchandi in the Area of EUDSD-V, under EUDD-III, Meerut.]
[E-Tender No.-14/EUDC/MEERUT/2022-2023][2022_PVVNL_687196_2]
|
Paschimanchal Vidyut Vitran Nigam Ltd.
|
10. |
18-May-2022 03:00 PM |
25-May-2022 01:00 PM |
26-May-2022 03:00 PM |
[Replacement of Damaged Transformer]
[39/EDC(M)/22-23][2022_PVVNV_700427_1]
|
Purvanchal Vidyut Vitran Nigam Limited Varanasi
|