1. |
19-May-2022 06:50 PM |
25-May-2022 03:30 PM |
26-May-2022 01:00 PM |
[3 PHASE METER EDD II ORAI]
[38/EDC(O)/W/2021-22][2021_DVVNL_664239_4]
|
Dakshinanchal Vidyut Vitran Nigam Ltd.
|
2. |
17-May-2022 09:00 AM |
25-May-2022 04:00 PM |
25-May-2022 04:30 PM |
[Patch repair work on various rural roads falling under Assistant Engineer V under construction block PWD Baghpat in district Baghpat]
[389/3A DT 13-05-2022][2022_CEMRT_699454_1]
|
Cheif Engineer Meerut Zone PWD Meerut||SE MEERUT CIRCLE PWD MEERUT||EE CONSTRUCTION DIVISION PWD BAGHPAT
|
3. |
26-Apr-2022 10:00 AM |
25-May-2022 04:00 PM |
27-May-2022 04:00 PM |
[Annual M and R of Sweeping and cleaning of Site office Obra-C, Maintenance of A.C., and water supply and maintenance of internal electrical supply]
[02/SE/OCCCC-I/OCCCD-II/22-23][2022_RVUNL_692306_1]
|
UP Rajya Vidyut Utpadan Nigam Ltd||Obra Thermal Power Project- UPRVUNL- Sonebhadra
|
4. |
23-Apr-2022 05:00 PM |
25-May-2022 04:00 PM |
26-May-2022 04:00 PM |
[01(W)/EDCS/2022-23]
[01(W)/EDCS/2022-23][2022_MVVNL_684534_2]
|
Madhyanchal Vidyut Vitran Nigam Ltd||C E - BAREILLY ZONE||S E - Shahjahanpur
|
5. |
18-May-2022 12:00 PM |
25-May-2022 04:00 PM |
25-May-2022 04:30 PM |
[MEMO/2022-23 date -17-05-2022]
[MEMO/2022-23 DATE 18-05-2022][2022_DOLBU_700357_1]
|
Directorate of Local Bodies UP||Nagar Palika Parishad Farukhabad Farukhabad
|
6. |
07-May-2022 09:00 AM |
25-May-2022 04:00 PM |
26-May-2022 02:00 PM |
[Work]
[Short Term E-Tender No. 102 ETC(GZP)/2021-22][2022_UPTCL_676971_2]
|
UP Power Transmission Corp.Ltd (Operation)||Chief Engineer (TE) East Allahabad||S.E. ETC Ghazipur
|
7. |
07-May-2022 09:00 AM |
25-May-2022 04:00 PM |
26-May-2022 02:00 PM |
[Work]
[E-tender No. 73 ETC(GZP)/2021-22][2021_UPTCL_638895_4]
|
UP Power Transmission Corp.Ltd (Operation)||Chief Engineer (TE) East Allahabad||S.E. ETC Ghazipur
|
8. |
04-Apr-2022 09:00 AM |
25-May-2022 04:00 PM |
26-May-2022 02:00 PM |
[Work]
[E-tender No. 110 ETC(GZP)/2021-22][2022_UPTCL_683972_1]
|
UP Power Transmission Corp.Ltd (Operation)||Chief Engineer (TE) East Allahabad||S.E. ETC Ghazipur
|
9. |
07-May-2022 09:00 AM |
25-May-2022 04:00 PM |
26-May-2022 02:00 PM |
[Work]
[E-tender No. 82 ETC(GZP)/2021-22][2021_UPTCL_648626_3]
|
UP Power Transmission Corp.Ltd (Operation)||Chief Engineer (TE) East Allahabad||S.E. ETC Ghazipur
|
10. |
20-May-2022 04:00 PM |
25-May-2022 04:00 PM |
25-May-2022 04:30 PM |
[GRAM MARTHARA DEVKISAN KE MAJARA BHAGWANPU URF NAGALA NIVRIYA ME BARATGHAR KA NIRMAD KARYA]
[92/RED/TENDER/2022-23 DATE 09-05-2022][2022_REDUP_701083_3]
|
Director Cum Chief Engineer RED||CHIEF ENGINEER WEST||SE ALIGARH CIRCLE||EE ETAH
|