1. |
29-Apr-2022 03:00 PM |
28-May-2022 01:00 PM |
28-May-2022 04:00 PM |
[Supply of various material to maintain electricity supply.]
[16/EDC(V)/2022-23 ][2022_PVVNV_694678_1]
|
Purvanchal Vidyut Vitran Nigam Limited Varanasi||Chief Engineer (D) PuVVNL Varanasi
|
2. |
04-May-2022 05:15 PM |
28-May-2022 01:00 PM |
28-May-2022 04:00 PM |
[Work of construction of 11 kv line,shifting of line under Vidhyak Nidhi.]
[21/EDC(V)/2022-23 ][2022_PVVNV_696169_1]
|
Purvanchal Vidyut Vitran Nigam Limited Varanasi||Chief Engineer (D) PuVVNL Varanasi
|
3. |
23-May-2022 10:00 AM |
28-May-2022 01:00 PM |
28-May-2022 02:00 PM |
[Earth Work in Silt Clearance with Dressing of Beso Trunk Drain from Km. 89.800 to Km. 76.300]
[01/EE/2022-23/614][2022_UPIDC_701727_1]
|
U P Irrigation Department (Civil)||Chief Engineer-Sharda Sahayak, Lucknow||XIV Circle Irrigation Works, Azamgarh||SSD-32, azamgarh
|
4. |
19-May-2022 01:00 PM |
28-May-2022 01:00 PM |
28-May-2022 01:30 PM |
[fodder tender block badagoan]
[168/badagaon/foddertender][2022_RDUP_700617_1]
|
Commissioner Rural Development UP||JDC Jhansi||CDO Jhansi||DDO Jhansi||BDO Badagaon
|
5. |
19-May-2022 01:00 PM |
28-May-2022 01:00 PM |
28-May-2022 01:30 PM |
[Fodder tender Block Bamaur]
[176/bamaur/foddertender][2022_RDUP_700618_1]
|
Commissioner Rural Development UP||JDC Jhansi||CDO Jhansi||DDO Jhansi||BDO Bamaur
|
6. |
19-May-2022 01:00 PM |
28-May-2022 01:00 PM |
28-May-2022 01:30 PM |
[Fodder tender block Gursarai]
[382/gursarai/foddertender][2022_RDUP_700621_1]
|
Commissioner Rural Development UP||JDC Jhansi||CDO Jhansi||DDO Jhansi||BDO Gursrai
|
7. |
04-Apr-2022 05:45 PM |
28-May-2022 01:00 PM |
28-May-2022 04:00 PM |
[Work of Carriage of Burnt transformer of 250 KVA and 400 KVA]
[03/EDC(V)/2022-23 ][2022_PVVNV_684724_1]
|
Purvanchal Vidyut Vitran Nigam Limited Varanasi||Chief Engineer (D) PuVVNL Varanasi
|
8. |
23-May-2022 01:00 PM |
28-May-2022 01:00 PM |
28-May-2022 01:30 PM |
[Patch Repair work on Village roads under AE-II in Dhaulana Assembly (Partly), Muradnagar Assembly (Partly)]
[303(i)/4A dated 21.05.2022][2022_CEMRT_701919_4]
|
Cheif Engineer Meerut Zone PWD Meerut||SE BULAND SHAHAR PWD BULANDSHAHAR||EE CONSTRUCTION DIVISION-2 PWD GAZIABAD
|
9. |
23-May-2022 01:00 PM |
28-May-2022 01:00 PM |
28-May-2022 01:30 PM |
[Patch Repair work on SH/MDR/ODR roads under AE-II in Dhaulana Assembly (Partly), Muradnagar Assembly (Partly)]
[303(i)/4A dated 21.05.2022][2022_CEMRT_701919_3]
|
Cheif Engineer Meerut Zone PWD Meerut||SE BULAND SHAHAR PWD BULANDSHAHAR||EE CONSTRUCTION DIVISION-2 PWD GAZIABAD
|
10. |
23-May-2022 01:00 PM |
28-May-2022 01:00 PM |
28-May-2022 01:30 PM |
[Repair work of Category-2, 3, 4 residential building located in DM Compound, Gandhinagar, Tehsil Parisar in district Ghaziabad.]
[303(i)/4A dated 21.05.2022][2022_CEMRT_701919_2]
|
Cheif Engineer Meerut Zone PWD Meerut||SE BULAND SHAHAR PWD BULANDSHAHAR||EE CONSTRUCTION DIVISION-2 PWD GAZIABAD
|