1. |
16-Mar-2024 06:00 PM |
16-Apr-2024 04:00 PM |
18-Apr-2024 12:00 PM |
[Work]
[T.No. 68/ETCS/2023-24][2024_UPTCL_918912_1]
|
UP Power Transmission Corp.Ltd (Operation)||Chief Engineer (TC) Lucknow||SE ETC Sultanpur||Accountant 400kv Substation Division Sultanpur
|
2. |
01-Apr-2024 05:00 PM |
16-Apr-2024 04:00 PM |
18-Apr-2024 12:00 PM |
[Construction of 33 KV Line Under EDC-II Gorakhpur]
[54/EWC(G)/2023-24][2024_PVVNV_920969_1]
|
Purvanchal Vidyut Vitran Nigam Limited Varanasi||Chief Engineer (D) PuVVNL Gorakhpur
|
3. |
11-Mar-2024 04:00 PM |
16-Apr-2024 04:00 PM |
18-Apr-2024 04:00 PM |
[Regarding Procurement of 3- Phase Slip Ring Induction Motor for Russian Wagon Tippler of Coal Handling Plant, CTPS, HTPS Kasimpur through Open Tender]
[ET-26/MMC/PD/ETPS/HTPS/2024][2024_RVUNL_913868_1]
|
UP Rajya Vidyut Utpadan Nigam Ltd||Harduaganj Thermal Power Project- UPRVUNL- Aligarh
|
4. |
14-Mar-2024 09:00 AM |
16-Apr-2024 04:00 PM |
18-Apr-2024 02:00 PM |
[WORK]
[E-TENDER No. 52 ETC-II(VNS)2023-24][2024_UPTCL_880066_5]
|
UP Power Transmission Corp.Ltd (Operation)||Chief Engineer (TE) East Allahabad||S.E. ETC Ghazipur
|
5. |
14-Mar-2024 09:00 AM |
16-Apr-2024 04:00 PM |
18-Apr-2024 02:00 PM |
[WORK]
[E-TENDER No. 51 ETC-II(VNS)2023-24][2024_UPTCL_880006_5]
|
UP Power Transmission Corp.Ltd (Operation)||Chief Engineer (TE) East Allahabad||S.E. ETC Ghazipur
|
6. |
01-Mar-2024 09:00 AM |
16-Apr-2024 04:00 PM |
18-Apr-2024 05:00 PM |
[T-05/AHD/DTPS/2023-2024]
[T-05/AHD/DTPS/2023-2024][2024_RVUNL_908254_1]
|
UP Rajya Vidyut Utpadan Nigam Ltd||Anpara Thermal Power Project- UPRVUNL- Sonebhadra
|
7. |
14-Mar-2024 09:00 AM |
16-Apr-2024 04:00 PM |
18-Apr-2024 02:00 PM |
[WORK]
[E-TENDER No. 50 ETC-II(VNS)2023-24][2024_UPTCL_879957_5]
|
UP Power Transmission Corp.Ltd (Operation)||Chief Engineer (TE) East Allahabad||S.E. ETC Ghazipur
|
8. |
11-Apr-2024 03:00 PM |
16-Apr-2024 04:00 PM |
16-Apr-2024 05:00 PM |
[ET No. 161/W/EUDC/SRE/2023-24]
[ET No. 161/W/EUDC/SRE/2023-24][2024_PVVNL_922068_1]
|
Paschimanchal Vidyut Vitran Nigam Ltd.
|
9. |
01-Apr-2024 05:00 PM |
16-Apr-2024 04:00 PM |
18-Apr-2024 12:00 PM |
[Increasing Capacity, repairing and strengthening work under EDC Deoria]
[49/EWC(G)/2023-24][2024_PVVNV_920962_1]
|
Purvanchal Vidyut Vitran Nigam Limited Varanasi||Chief Engineer (D) PuVVNL Gorakhpur
|
10. |
15-Mar-2024 09:00 AM |
16-Apr-2024 04:30 PM |
16-Apr-2024 05:00 PM |
[Construction of 100 Bedded Critical Care Hospital Block At Government Medical Collage Distt. Hardoi ]
[ 256 / NIVIDA / 140 Dated 12-03-2024 ][2024_UPCDS_917438_1]
|
Construction and Design Services UP Jal Nigam||C.G.M. (HQ)||G.M. (HQ)||P.M. (HQ)
|