1. |
18-Mar-2024 11:00 AM |
28-Mar-2024 04:00 PM |
29-Mar-2024 11:00 AM |
[WARD NO-13 HANUMANT NAGAR ME JAFAR KHAN KE MAKAN SE ALGANTPUR MOD TAK C.C. ROAD KA KARYA (CH 275-500 M)]
[1567/nppsdr/2023-24][2024_DOLBU_918652_6]
|
Directorate of Local Bodies UP||Nagar Palika Parishad Siddharthnagar Siddharthnagar
|
2. |
18-Mar-2024 11:00 AM |
28-Mar-2024 04:00 PM |
29-Mar-2024 11:00 AM |
[WARD NO-13 HANUMANT NAGAR ME JAFAR KHAN KE MAKAN SE ALGANTPUR MOD TAK C.C. ROAD KA KARYA (CH 500-825 M)]
[1567/nppsdr/2023-24][2024_DOLBU_918652_7]
|
Directorate of Local Bodies UP||Nagar Palika Parishad Siddharthnagar Siddharthnagar
|
3. |
30-Jan-2024 09:00 AM |
28-Mar-2024 04:00 PM |
30-Mar-2024 05:00 PM |
[Supply of Tube nest assembly of Turbine oil cooler of 3X210]
[T-65/CF-173/PD-I/ABTPS/ ANP/2023-24][2024_RVUNL_887188_1]
|
UP Rajya Vidyut Utpadan Nigam Ltd||Anpara Thermal Power Project- UPRVUNL- Sonebhadra
|
4. |
28-Feb-2024 06:00 PM |
28-Mar-2024 04:00 PM |
29-Mar-2024 02:00 PM |
[DIESEL VEHICLE FOR EE, EUDD-IV GKP]
[48EUDC(G)/2023-24][2024_PVVNV_907349_1]
|
Purvanchal Vidyut Vitran Nigam Limited Varanasi||Chief Engineer (D) PuVVNL Gorakhpur
|
5. |
20-Mar-2024 04:00 PM |
28-Mar-2024 04:00 PM |
28-Mar-2024 05:00 PM |
[Supply of Vehicles at MSCL office for 1 year under smart City Mission.]
[2821/MSCL/2024 Dated 20.03.2024][2024_MSCL_919473_1]
|
Moradabad Smart City Limited
|
6. |
08-Mar-2024 04:00 PM |
28-Mar-2024 04:00 PM |
30-Mar-2024 04:00 PM |
[T- 63/PD-II/DTPS/CF-224/2023-24]
[T-63/PD-II/DTPS/CF-224/2023-24][2024_RVUNL_914372_1]
|
UP Rajya Vidyut Utpadan Nigam Ltd||Anpara Thermal Power Project- UPRVUNL- Sonebhadra
|
7. |
20-Mar-2024 10:00 AM |
28-Mar-2024 04:00 PM |
28-Mar-2024 05:00 PM |
[Supply work, Installation and 24X7 operation of temporary Shoe racks for minimum 10 locations on Dharam path, Ayodhya for 3 days (16th, 17th and 18th April 2024) during Ramnavami Festival in Ayodhya.]
[2363/NNA/2024][2024_DOLBU_919374_1]
|
Directorate of Local Bodies UP||Ayodhya Municipal Corporation
|
8. |
06-Mar-2024 09:00 AM |
28-Mar-2024 04:00 PM |
30-Mar-2024 02:00 PM |
[WORK]
[E-TENDER No. 65 ETC-II(VNS)2023-24][2024_UPTCL_911338_1]
|
UP Power Transmission Corp.Ltd (Operation)||Chief Engineer (TE) East Allahabad||S.E. ETC Ghazipur
|
9. |
21-Mar-2024 09:00 AM |
28-Mar-2024 04:00 PM |
30-Mar-2024 02:00 PM |
[Supply of 11 KV HT TVM Cat-A Meter, 11 KV HT TVM Cat-B Meter, 11 KV HT TVM Cat-C Meter, 33 KV HT TVM Cat-A Meter, 33 KV HT TVM Cat-B Meter and 33 KV HT TVM Cat-C Meter]
[MEDCO/2887/2024][2024_MVVNL_912341_3]
|
Madhyanchal Vidyut Vitran Nigam Ltd||C E (MM)
|
10. |
22-Feb-2024 06:30 PM |
28-Mar-2024 04:00 PM |
30-Mar-2024 04:00 PM |
[Supply Of Vulcanized endless rubber belt for raw coal feeder, 2x500MW, BTPS and DTPS, Anpara]
[T-75/CF-259/PD-I/ABTPS/ ANP/2023-24][2024_RVUNL_903039_1]
|
UP Rajya Vidyut Utpadan Nigam Ltd||Anpara Thermal Power Project- UPRVUNL- Sonebhadra
|