1. |
18-Apr-2024 06:00 PM |
25-Apr-2024 04:00 PM |
26-Apr-2024 02:00 PM |
[Providing 01 no. diesel Vehicle with driver for the Anti Power Theft, Santkabirnagar for the Period 01.04.2024 to 31.03.2025]
[108/EDC(SKN)/2023-24][2024_PVVNV_903497_2]
|
Purvanchal Vidyut Vitran Nigam Limited Varanasi||Chief Engineer (D) PuVVNL Basti
|
2. |
15-Mar-2024 06:00 PM |
25-Apr-2024 04:00 PM |
26-Apr-2024 03:00 PM |
[Development of Infrastructure for Electrification of Un-electrified Households]
[EAV-206/2023-24][2024_PVVNV_917801_1]
|
Purvanchal Vidyut Vitran Nigam Limited Varanasi
|
3. |
19-Apr-2024 04:00 PM |
25-Apr-2024 04:00 PM |
26-Apr-2024 02:00 PM |
[Providing 01 no. diesel Vehicle with driver for the Executive Engineer, Electricity Test Division, Santkabirnagar for the Period 01.04.2024 to 31.03.2025]
[106/EDC(SKN)/2023-24][2024_PVVNV_903455_2]
|
Purvanchal Vidyut Vitran Nigam Limited Varanasi||Chief Engineer (D) PuVVNL Basti
|
4. |
17-Apr-2024 10:00 AM |
25-Apr-2024 04:00 PM |
26-Apr-2024 02:00 PM |
[Supply of 11/0.433 KV, 400 KVA, 1 Star Previously Level-2 Now Level-1 as per (IS 1180 Part-I) 2014 (Amendment-4) Copper Wound Distribution Transformer BIS Certified with Protection Features]
[MEDCO/2904/2024][2024_MVVNL_919384_2]
|
Madhyanchal Vidyut Vitran Nigam Ltd||C E (MM)
|
5. |
15-Mar-2024 12:00 PM |
25-Apr-2024 04:00 PM |
26-Apr-2024 01:00 PM |
[work for installation of 33 kv control pannel , VCB,PT, CT Isollater LA etc ud EDD-I Jnp]
[85/EDC-I(Jnp)/2023-24][2024_PVVNV_917354_1]
|
Purvanchal Vidyut Vitran Nigam Limited Varanasi
|
6. |
28-Feb-2024 03:15 PM |
25-Apr-2024 04:00 PM |
26-Apr-2024 02:00 PM |
[Tourism development work of Kali Devi Mandir Ramlila Bagh Block-Nagina, District Bijnor (U.P.)]
[715/M-18/214 dated 27-02-2024][2024_UPCDS_907157_1]
|
Construction and Design Services UP Jal Nigam||C.G.M. (III) Lucknow||G.M. (01) Lucknow||Unit-18 Moradabad
|
7. |
01-Apr-2024 06:00 PM |
25-Apr-2024 04:00 PM |
27-Apr-2024 06:00 PM |
[Supply of Stationary Items for BTPS, Obra]
[OBR/6000003899/T-01/PD-I/24-25][2024_RVUNL_921034_1]
|
UP Rajya Vidyut Utpadan Nigam Ltd||Obra Thermal Power Project- UPRVUNL- Sonebhadra
|
8. |
01-Apr-2024 02:50 PM |
25-Apr-2024 04:00 PM |
26-Apr-2024 11:00 AM |
[01/ETD(H)/2024-25]
[01/ETD(H)/2024-25][2024_UPTCL_920982_1]
|
UP Power Transmission Corp.Ltd (Operation)||Chief Engineer (TS) South Agra||SE, ETC, Mathura||EE, ETD, Hathras
|
9. |
01-Apr-2024 06:00 PM |
25-Apr-2024 04:00 PM |
27-Apr-2024 06:00 PM |
[Procurement of Hydrogen Gas for Obra Thermal Power Station, Obra]
[OBR/6000004984/T-02/PD-I/24-25][2024_RVUNL_921038_1]
|
UP Rajya Vidyut Utpadan Nigam Ltd||Obra Thermal Power Project- UPRVUNL- Sonebhadra
|
10. |
15-Mar-2024 01:00 PM |
25-Apr-2024 04:00 PM |
26-Apr-2024 03:00 PM |
[DEVELOPMENT OF INFRASTRUCTURE FOR ELECTRIFICATION OF UN-ELECTRIFIED HOUSEHOLDS]
[EAV-203/2023-24][2024_PVVNV_917544_1]
|
Purvanchal Vidyut Vitran Nigam Limited Varanasi
|