1. |
19-Apr-2024 10:00 AM |
25-Apr-2024 04:00 PM |
25-Apr-2024 04:10 PM |
[Stationary Supply to District Cooperative Bank Etah for 1 year]
[70_Store_2024-25][2024_UPCBL_922553_1]
|
UP Cooperative Bank Ltd.||Etah District Co-Operative Bank Ltd.
|
2. |
18-Apr-2024 06:00 PM |
25-Apr-2024 04:00 PM |
26-Apr-2024 02:00 PM |
[Providing 01 no. diesel Vehicle with driver for the Anti Power Theft, Santkabirnagar for the Period 01.04.2024 to 31.03.2025]
[108/EDC(SKN)/2023-24][2024_PVVNV_903497_2]
|
Purvanchal Vidyut Vitran Nigam Limited Varanasi||Chief Engineer (D) PuVVNL Basti
|
3. |
19-Mar-2024 06:55 PM |
25-Apr-2024 04:00 PM |
26-Apr-2024 02:00 PM |
[33/11KV, 10 MVA Power Transformer]
[MEDCO/2905/2024][2024_MVVNL_919363_1]
|
Madhyanchal Vidyut Vitran Nigam Ltd||C E (MM)
|
4. |
20-Mar-2024 10:00 AM |
25-Apr-2024 04:00 PM |
26-Apr-2024 02:00 PM |
[Supply of 11/0.433 KV, 250 KVA, 1 Star Previously Level-2 Now Level-1 as per (IS 1180 Part-I) 2014 (Amendment-4) Copper Wound Distribution Transformer BIS Certified with Protection Features]
[MEDCO/2903/2024][2024_MVVNL_919383_1]
|
Madhyanchal Vidyut Vitran Nigam Ltd||C E (MM)
|
5. |
15-Mar-2024 01:00 PM |
25-Apr-2024 04:00 PM |
26-Apr-2024 03:00 PM |
[DEVELOPMENT OF INFRASTRUCTURE FOR ELECTRIFICATION OF UN-ELECTRIFIED HOUSEHOLDS]
[EAV-203/2023-24][2024_PVVNV_917544_1]
|
Purvanchal Vidyut Vitran Nigam Limited Varanasi
|
6. |
15-Mar-2024 12:00 PM |
25-Apr-2024 04:00 PM |
26-Apr-2024 01:00 PM |
[work for installation of 33 kv control pannel , VCB,PT, CT Isollater LA etc ud EDD-I Jnp]
[85/EDC-I(Jnp)/2023-24][2024_PVVNV_917354_1]
|
Purvanchal Vidyut Vitran Nigam Limited Varanasi
|
7. |
15-Mar-2024 06:00 PM |
25-Apr-2024 04:00 PM |
26-Apr-2024 03:00 PM |
[Development of Infrastructure for Electrification of Un-electrified Households]
[EAV-207/2023-24][2024_PVVNV_917871_1]
|
Purvanchal Vidyut Vitran Nigam Limited Varanasi
|
8. |
19-Apr-2024 04:00 PM |
25-Apr-2024 04:00 PM |
26-Apr-2024 02:00 PM |
[Providing 01 no. diesel Vehicle with driver for the Executive Engineer, Electricity Test Division, Santkabirnagar for the Period 01.04.2024 to 31.03.2025]
[106/EDC(SKN)/2023-24][2024_PVVNV_903455_2]
|
Purvanchal Vidyut Vitran Nigam Limited Varanasi||Chief Engineer (D) PuVVNL Basti
|
9. |
15-Mar-2024 06:00 PM |
25-Apr-2024 04:00 PM |
26-Apr-2024 03:00 PM |
[Development of Infrastructure for Electrification of Un-electrified Households]
[EAV-206/2023-24][2024_PVVNV_917801_1]
|
Purvanchal Vidyut Vitran Nigam Limited Varanasi
|
10. |
28-Feb-2024 03:15 PM |
25-Apr-2024 04:00 PM |
26-Apr-2024 02:00 PM |
[Tourism development work of Kali Devi Mandir Ramlila Bagh Block-Nagina, District Bijnor (U.P.)]
[715/M-18/214 dated 27-02-2024][2024_UPCDS_907157_1]
|
Construction and Design Services UP Jal Nigam||C.G.M. (III) Lucknow||G.M. (01) Lucknow||Unit-18 Moradabad
|