1. |
29-Jun-2022 04:00 PM |
05-Jul-2022 01:00 PM |
05-Jul-2022 05:00 PM |
[The work of installation of 3 phase meter on PTWs of LMV-5 category at unmetered consumer premises at ETD, Banda]
[EDCBNDA-14/2022-23][2022_DVVNL_701339_3]
|
Dakshinanchal Vidyut Vitran Nigam Ltd.
|
2. |
14-May-2022 10:00 AM |
05-Jul-2022 01:00 PM |
06-Jul-2022 04:00 PM |
[Work of LMV-5 and LMV-8 Consumers Downloading, billing and Bill Distribution (From 10 KW and above) in DVVNL, Agra Districts divided in 6 zones]
[DVVNL-MM/3180-2022][2022_DVVNL_699656_1]
|
Dakshinanchal Vidyut Vitran Nigam Ltd.
|
3. |
20-Jun-2022 06:00 PM |
05-Jul-2022 01:00 PM |
05-Jul-2022 02:00 PM |
[33/W/EDC II/SRE/2022-23]
[33/W/EDC II/SRE/2022-23][2022_PVVNL_704277_2]
|
Paschimanchal Vidyut Vitran Nigam Ltd.
|
4. |
29-Apr-2022 02:00 PM |
05-Jul-2022 01:00 PM |
05-Jul-2022 04:00 PM |
[Providing Vehicle for Dy.CAO,Varanasi]
[13/EDC(V)/2022-23 ][2022_PVVNV_694668_1]
|
Purvanchal Vidyut Vitran Nigam Limited Varanasi||Chief Engineer (D) PuVVNL Varanasi
|
5. |
24-Jun-2022 02:30 PM |
05-Jul-2022 01:00 PM |
05-Jul-2022 03:00 PM |
[Plantation work at various Substation under ETD Jhansi.]
[ETS-04/ETDJ/22-23][2022_UPTCL_710519_1]
|
UP Power Transmission Corp.Ltd (Operation)||Chief Engineer (TSC) South Central Jhansi||SE ETC, Jhansi||EE, ETD, Jhansi
|
6. |
29-Jun-2022 04:00 PM |
05-Jul-2022 01:00 PM |
05-Jul-2022 05:00 PM |
[Full deposit works under EDSD, Chilla Road, Banda]
[EDCBNDA-11/2022-23][2022_DVVNL_701329_3]
|
Dakshinanchal Vidyut Vitran Nigam Ltd.
|
7. |
29-Jun-2022 04:00 PM |
05-Jul-2022 01:00 PM |
05-Jul-2022 05:00 PM |
[Full deposit works under EDSD, Pili-Kothi, Banda]
[EDCBNDA-12/2022-23][2022_DVVNL_701332_3]
|
Dakshinanchal Vidyut Vitran Nigam Ltd.
|
8. |
29-Jun-2022 04:00 PM |
05-Jul-2022 01:00 PM |
05-Jul-2022 05:00 PM |
[Electrification work of primary and upper primary schools at various places under full deposit scheme under EDD, Banda]
[EDCBNDA-13/2022-23][2022_DVVNL_701334_3]
|
Dakshinanchal Vidyut Vitran Nigam Ltd.
|
9. |
27-May-2022 06:00 PM |
05-Jul-2022 01:00 PM |
05-Jul-2022 03:00 PM |
[WORK OF REPLACEMENT OF GASKET OF 20 MVA TRANSFORMER TELK MAKE AT 132 KV SUB-STATION AWAS VIKAS UNDER ELECTRICITY TRANSMISSION DIVISION-I, MORADABAD]
[E-T-15/ETCM/2022-2023][2022_UPTCL_703624_1]
|
UP Power Transmission Corp.Ltd (Operation)||Chief Engineer (TW) West Meerut||SE ETC-I MURADABAD
|
10. |
30-Apr-2022 06:00 PM |
05-Jul-2022 01:00 PM |
05-Jul-2022 03:00 PM |
[WORK OF REPLACEMENT OF GASKET OF 40 MVA TRANSFORMER-II GEC MAKE AT 132 KV SUB-STATION AWAS VIKAS UNDER ELECTRICITY TRANSMISSION DIVISION-I, MORADABAD ]
[E-T-07/ETCM/2022-2023][2022_UPTCL_683713_2]
|
UP Power Transmission Corp.Ltd (Operation)||Chief Engineer (TW) West Meerut||SE ETC-I MURADABAD
|