1. |
10-Apr-2024 04:00 PM |
19-Apr-2024 10:00 AM |
20-Apr-2024 10:30 AM |
[Work]
[T-04/ETDB/2024-25][2024_UPTCL_921994_1]
|
UP Power Transmission Corp.Ltd (Operation)||Chief Engineer (TS) South Agra||SE ETC Banda||EE ETD Banda
|
2. |
10-Apr-2024 04:00 PM |
19-Apr-2024 10:00 AM |
20-Apr-2024 11:00 AM |
[Work]
[T-05/ETDB/2024-25][2024_UPTCL_921996_1]
|
UP Power Transmission Corp.Ltd (Operation)||Chief Engineer (TS) South Agra||SE ETC Banda||EE ETD Banda
|
3. |
08-Apr-2024 10:00 AM |
19-Apr-2024 11:00 AM |
19-Apr-2024 11:00 AM |
[Ramala Chini Mill Operation and Maintenance Through out Sourcing]
[49/e-tender/Mill Op./2024-25 Dated 06.04.2024][2024_RSCML_921719_1]
|
Ramala Sahkari Chini Mills Ltd. Ramala (Baghpat)
|
4. |
28-Mar-2024 04:30 PM |
19-Apr-2024 11:00 AM |
19-Apr-2024 03:00 PM |
[Work]
[ET-06/ETD-I (K)/2023-24][2024_UPTCL_920616_1]
|
UP Power Transmission Corp.Ltd (Operation)||Chief Engineer (TS) South Agra||S.E. ETC-I Kanpur||EE ETD - I Kanpur
|
5. |
13-Mar-2024 05:00 PM |
19-Apr-2024 11:00 AM |
19-Apr-2024 03:00 PM |
[PROVIDING 01 NO 5.0 KVA GENERATOR SET WITH OPERATOR UNDER EXECUTIVE ENGINEER ETD III BULANDSHAHR.]
[101/EDC-III/B/2023-2024][2024_PVVNL_916446_1]
|
Paschimanchal Vidyut Vitran Nigam Ltd.
|
6. |
03-Apr-2024 06:00 PM |
19-Apr-2024 11:00 AM |
20-Apr-2024 03:00 PM |
[e]
[T-01/ETD/MUN/2024-25][2024_UPTCL_921238_1]
|
UP Power Transmission Corp.Ltd (Operation)||Chief Engineer (TW) West Meerut||SE ETC Ghaziabad||EE ETD MURADNAGAR
|
7. |
06-Apr-2024 04:30 PM |
19-Apr-2024 12:00 PM |
20-Apr-2024 12:00 PM |
[Supply of various type material for 765 KV S/S Fatehabad , Agra]
[ET_02_ETC_A_24-25][2024_UPTCL_919108_2]
|
UP Power Transmission Corp.Ltd (Operation)||Chief Engineer (TS) South Agra||S.E. ETC Agra||Divisional Accountant, ETD-I, Agra
|
8. |
06-Apr-2024 09:00 AM |
19-Apr-2024 12:00 PM |
19-Apr-2024 02:00 PM |
[EDCH-163/2023-24]
[EDCH-163/2023-24][2024_DVVNL_901248_3]
|
Dakshinanchal Vidyut Vitran Nigam Ltd.
|
9. |
07-Apr-2024 09:00 AM |
19-Apr-2024 12:00 PM |
19-Apr-2024 02:00 PM |
[EDCH-171/2023-24]
[EDCH-171/2023-24][2024_DVVNL_901808_2]
|
Dakshinanchal Vidyut Vitran Nigam Ltd.
|
10. |
13-Apr-2024 05:15 PM |
19-Apr-2024 12:00 PM |
19-Apr-2024 04:00 PM |
[Supply of Material Related 33/11 KV Substation Maintenance and Breakdown under EDD-IV AZM]
[27/EDC-II(A)/2023-24][2024_PVVNV_922198_1]
|
Purvanchal Vidyut Vitran Nigam Limited Varanasi||Chief Engineer (D) PuVVNL Azamgarh
|