1. |
22-Feb-2024 02:00 PM |
19-Apr-2024 03:30 PM |
20-Apr-2024 01:00 PM |
[64/EDC(O)/W/2023-24]
[64/EDC(O)/W/2023-24][2024_DVVNL_902750_1]
|
Dakshinanchal Vidyut Vitran Nigam Ltd.
|
2. |
01-Mar-2024 05:00 PM |
19-Apr-2024 03:30 PM |
20-Apr-2024 01:00 PM |
[67/EDC(O)/W/2023-24]
[67/EDC(O)/W/2023-24][2024_DVVNL_909200_1]
|
Dakshinanchal Vidyut Vitran Nigam Ltd.
|
3. |
13-Apr-2024 12:00 PM |
19-Apr-2024 03:30 PM |
20-Apr-2024 01:00 PM |
[57/EDC(O)/P/2023-24 ]
[57/EDC(O)/P/2023-24][2024_DVVNL_893799_3]
|
Dakshinanchal Vidyut Vitran Nigam Ltd.
|
4. |
22-Feb-2024 03:00 PM |
19-Apr-2024 03:30 PM |
20-Apr-2024 01:00 PM |
[65/EDC(O)/W/2023-24]
[65/EDC(O)/W/2023-24][2024_DVVNL_902768_1]
|
Dakshinanchal Vidyut Vitran Nigam Ltd.
|
5. |
06-Mar-2024 05:30 PM |
19-Apr-2024 03:30 PM |
20-Apr-2024 01:00 PM |
[66/EDC(O)/W/2023-24 ]
[66/EDC(O)/W/2023-24][2024_DVVNL_902782_2]
|
Dakshinanchal Vidyut Vitran Nigam Ltd.
|
6. |
18-Mar-2024 12:00 PM |
19-Apr-2024 04:00 PM |
20-Apr-2024 12:00 PM |
[work for system strenghtening of HT LT etc work under BP scheme in the area of EDD-IV, Jaunpur]
[97/EDC-I(Jnp)/2023-24][2024_PVVNV_919079_1]
|
Purvanchal Vidyut Vitran Nigam Limited Varanasi
|
7. |
18-Mar-2024 12:00 PM |
19-Apr-2024 04:00 PM |
20-Apr-2024 12:00 PM |
[work for installation of Delta earthing of power TF and 11Kv swithchgear and fabrication and errection of taillless unit for under EDD-IV Jnp]
[98/EDC-I(Jnp)/2023-24][2024_PVVNV_919082_1]
|
Purvanchal Vidyut Vitran Nigam Limited Varanasi
|
8. |
15-Mar-2024 12:00 PM |
19-Apr-2024 04:00 PM |
20-Apr-2024 12:00 PM |
[work for installation of 33 kv control pannel , VCB,PT, CT Isollater LA etc ud EDD-I Jnp]
[85/EDC-I(Jnp)/2023-24][2024_PVVNV_917354_1]
|
Purvanchal Vidyut Vitran Nigam Limited Varanasi
|
9. |
11-Mar-2024 09:00 AM |
19-Apr-2024 04:00 PM |
19-Apr-2024 04:30 PM |
[Nagar Nigam Ayodhya Sewerage Scheme District 1 Part-II and District-1 Part-I Zone-1 and 2]
[446/W-77/03][2024_UPJNM_915053_1]
|
U P Jal Nigam (HQ), Lucknow||Chief Engineer (Faizabad)||SE, CC, Faizabad||PM Urban Works Unit Faizabad
|
10. |
20-Feb-2024 11:00 AM |
19-Apr-2024 04:00 PM |
19-Apr-2024 05:00 PM |
[Construction of Main Building, Cafeteria and Guest House at Government Polytechnic, Mirzapur, Distt- Mirzapur ]
[283/W-1/11 Dated 19.02.2024][2024_UPCDS_900858_1]
|
Construction and Design Services UP Jal Nigam||C.G.M. (IV) Lucknow||G.M. (14) Lucknow||Unit - 38 Sonebhadra
|